Skip to content
AnsweredAAbutPierQ&A #1173062013-04-05 15:55 · Views 263

Inquiry about load combinations

질문을 첨부해 드립니다. 검토 부탁드립니다.

Follow-up

언제쯤 검토가 가능한가요?

Answer

안녕하세요. 한길아이티입니다. 답변이 늦어 죄송합니다. 해당 하중조합을 수정하여 패치적용하였습니다. 하중조합에서 권고안 실행시 적용됩니다. 감사합니다.

Answer

안녕하세요. 한길아이티입니다. 답변이 늦어 죄송합니다. 하중조합의 변경부분을 권고안으로 처리하였습니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#186158When entering pier tie bars442004-06-08
AnsweredAAbutPier#186155Please correct EL. again152004-06-08
AnsweredAAbutPier#186161Subgrade reaction in foundation design172004-06-08
AnsweredAAbutPier#186150Seismic analysis412004-06-08
AnsweredAAbutPier#186143Inquiry about bearing capacity check for pier mass foundation182004-06-08
AnsweredAAbutPier#186136Inquiry about design seismic force from seismic analysis292004-06-08
AnsweredAAbutPier#186132Uploading file52004-06-07
AnsweredAAbutPier#186126Horizontal force calculation for seismic load132004-06-07
AnsweredAAbutPier#186151Checking the hollow pier calculation report482004-06-07
AnsweredAAbutPier#186144Inquiry about cover at top of parapet wall112004-06-07
AnsweredAAbutPier#186120Cross ties in column tie bar reinforcement detailing262004-06-07
AnsweredAAbutPier#186117Request for review92004-06-07
AnsweredAAbutPier#186139Quantity calculation criteria122004-06-07
AnsweredAAbutPier#186135About the hollow pier calculation report312004-06-07
AnsweredAAbutPier#186131About the hollow pier structural calculation report192004-06-07
AnsweredAAbutPier#186129Error when generating drawings52004-06-07
AnsweredAAbutPier#186118Inquiry about pier drawings242004-06-07
AnsweredAAbutPier#186116About EL calculation132004-06-06
AnsweredAAbutPier#186115About the abutment general drawing242004-06-05
AnsweredAAbutPier#186113About the structural calculation report292004-06-05
Sign in to ask