AnsweredAAbutPierQ&A #1162892013-02-18 20:26 · Views 281

Deducted soil quantity does not match illustration

안녕하세요. 교대 토공수량산출시 공제토의 노상, 노체 수량산출근거에서 출력된 삽도와 수량산출 치수가 불일치합니다. 확인하시고 이유에 대해 설명바랍니다. 첨부로 토공수량산출서와 apr파일을 올립니다. 빠른 답변 부탁드립니다.

Answer

안녕하세요. 한길아이티입니다. 질의하신 출력된 삽도와 산출근거의 상이한 부분을 수정하여 패치적용하였습니다. 삽도가 맞게 나오고 있는것이었으며, 산출근거의 오류였습니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#185135Abutment widening432004-03-17
AnsweredAAbutPier#185129Pier reinforcement drawing162004-03-17
AnsweredAAbutPier#185128Beam length and minimum distance to slab end when placing PSC beams472004-03-16
AnsweredAAbutPier#185123Seismic172004-03-16
AnsweredAAbutPier#185117Bearing locations overlap at pier...152004-03-16
AnsweredAAbutPier#185124Chapter 2 illustration: lateral distribution figure212004-03-16
AnsweredAAbutPier#185121Calculating additional wall height282004-03-16
AnsweredAAbutPier#185104When abutment widths differ at start and end...552004-03-14
AnsweredAAbutPier#185093Pier drawings222004-03-13
AnsweredAAbutPier#185091During seismic analysis...252004-03-13
AnsweredAAbutPier#185084Seismic462004-03-12
AnsweredAAbutPier#185098Alignment check request912004-03-12
AnsweredAAbutPier#185076Earth pressure coefficient and friction angle in wall section check1052004-03-11
AnsweredAAbutPier#185069Bridge bearings482004-03-11
AnsweredAAbutPier#185063Inquiry about pier foundation calculation172004-03-10
AnsweredAAbutPier#185061[Question] Rebar fabrication and quantities in wing wall drawings312004-03-10
AnsweredAAbutPier#185052Pier calculation report won't print192004-03-10
AnsweredAAbutPier#185051Two-layer rebar at top of pier coping...162004-03-10
AnsweredAAbutPier#185045Crash after entering pier cap beam rebar262004-03-09
AnsweredAAbutPier#185050About drawings352004-03-09