Skip to content
AnsweredAAbutPierQ&A #1149692012-12-08 01:30 · Views 209

Concrete quantity not calculated for approach slab skewed corner

기존 접속슬래브 파일과 금번 피어로 출력한 접속슬래브 수량 파일을 같이 첨부합니다 확인 부탁드립니다

Answer

안녕하세요. 한길아이티입니다. 답변이 너무 늦어 죄송합니다. 접속슬래브에 대한 수량산출방법이 약간 변경되었는데 변경중 고려되지 못한 부분이 있었던 것으로 확인되어 수정을 진행하였습니다. 패치후 수량산출하시면 사각부에대한 수량도 산출됨을 확인하실 수 있습니다. 다만 날개벽헌치에 의한 단면변화도 고려하게 되는등 몇가지 변경사항이 있어 이전 수량과 정확히 일치하지는 않습니다. 이점 양해부탁드립니다. 감사합니다.

Attached images 1

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#183212Bearing area reinforcing rebar562003-10-24
AnsweredAAbutPier#183207Crack check not performed when checking main rebar482003-10-24
AnsweredAAbutPier#183205Please take a look at this432003-10-24
AnsweredAAbutPier#183188Please review432003-10-24
AnsweredAAbutPier#183204Follow-up on post no. 5370432003-10-23
AnsweredAAbutPier#183177Abutment main rebar not placed in two layers642003-10-23
AnsweredAAbutPier#183196Block creation when using APIER452003-10-23
AnsweredAAbutPier#183184Please fix (restarting - 13)452003-10-23
AnsweredAAbutPier#183166Please review - abutment skew1102003-10-23
AnsweredAAbutPier#183161About pier calculation652003-10-23
AnsweredAAbutPier#183147Load values in column design differ greatly522003-10-22
AnsweredAAbutPier#183144Program keeps crashing482003-10-22
AnsweredAAbutPier#183145Please review482003-10-22
AnsweredAAbutPier#183139Cannot proceed with abutment input532003-10-22
AnsweredAAbutPier#183130Converting the steel material table352003-10-21
AnsweredAAbutPier#183126Inquiry about road centerline section432003-10-21
AnsweredAAbutPier#183125Please review522003-10-21
AnsweredAAbutPier#183120Bridge bearing layout drawing 2312003-10-21
AnsweredAAbutPier#183119*** Bearing layout drawing392003-10-21
AnsweredAAbutPier#183108Questions from ***482003-10-21
Sign in to ask