AnsweredAAbutPierQ&A #1864372004-06-18 19:10 · Views 6

Uploading the file I called about

파일이 열리지 않습니다... 확인해 보시고 빠른 답변 부탁 드립니다..

Answer

안녕하세요. 한길아이티입니다. 복구하였습니다. 파일 첨부합니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#186447About seismic analysis modeling172004-06-18
AnsweredAAbutPier#186446Question about abutment reinforcement drawing output142004-06-18
AnsweredAAbutPier#186444Exported DXF won't open in CAD72004-06-18
AnsweredAAbutPier#186443Questions on seismic, pier bearing pedestal concrete and approach slab292004-06-18
AnsweredAAbutPier#186441About seismic analysis142004-06-18
AnsweredAAbutPier#186438Uploading the file discussed by phone92004-06-18
AnsweredAAbutPier#186437Uploading the file I called about · Currently viewing62004-06-18
AnsweredAAbutPier#186445Common quantity summary table102004-06-18
AnsweredAAbutPier#186434About pier analysis242004-06-18
AnsweredAAbutPier#186433Beam layout on reverse curves832004-06-18
AnsweredAAbutPier#186429Automatic girder layout fails when entering span angle242004-06-18
AnsweredAAbutPier#186425About the approach slab402004-06-17
AnsweredAAbutPier#186423Reposting132004-06-17
AnsweredAAbutPier#186416Question about precast caps for hollow piers172004-06-17
AnsweredAAbutPier#186413Applying the girder end chamfer angle192004-06-17
AnsweredAAbutPier#186411Level handling does not work properly102004-06-17
AnsweredAAbutPier#186422Manhole detail drawing502004-06-17
AnsweredAAbutPier#186419Shear rebar, splice length and main rebar spacing202004-06-17
AnsweredAAbutPier#186407About the abutment calculation report82004-06-17
AnsweredAAbutPier#186406About the rebar material schedule152004-06-17
Sign in to ask