When entering bridge bearings
스틸교량에서 brx파일을 불러왔을경우 교좌장치를 선택하면 슈제원중 높이에 관한항목이 바뀌지않습니다. 슈방향이외에는 모두 수동입력이 가능하게 되어있는데 입력에 문제가 있습니다. H1,H3,H4항목이 246,80,26 에서 바뀌지가 않는군요, 빠른 검토 부탁드립니다.
Answer
안녕하세요. 한길아이티입니다. 확인한 바 이상이 없습니다. 기타사항은 전화로 말씀드렸습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #186221 | In the coordinate and EL calculation drawings | 4 | 2004-06-10 |
| Answered | AAbutPier | #186214 | When entering bridge bearings · Currently viewing | 7 | 2004-06-10 |
| Answered | AAbutPier | #186210 | [Urgent] Rebar data issue | 11 | 2004-06-10 |
| Answered | AAbutPier | #186199 | Bearing rebar diameter cannot be changed | 9 | 2004-06-09 |
| Answered | AAbutPier | #186197 | Wing wall rebar quantity | 5 | 2004-06-09 |
| Answered | AAbutPier | #186195 | Pier tie bars | 4 | 2004-06-09 |
| Answered | AAbutPier | #186188 | Applying piles individually | 11 | 2004-06-09 |
| Answered | AAbutPier | #186187 | Skew angle representation | 19 | 2004-06-09 |
| Answered | AAbutPier | #186207 | In the bridge bearing detail | 15 | 2004-06-09 |
| Answered | AAbutPier | #186202 | Follow-up question | 4 | 2004-06-09 |
| Answered | AAbutPier | #186189 | Reaction values | 22 | 2004-06-09 |
| Answered | AAbutPier | #186185 | About hollow pier drawings | 16 | 2004-06-09 |
| Answered | AAbutPier | #186184 | About the general drawing | 19 | 2004-06-09 |
| Answered | AAbutPier | #186182 | Error generating T-shaped pier calculation report | 22 | 2004-06-09 |
| Answered | AAbutPier | #186181 | When applying wind load | 21 | 2004-06-09 |
| Answered | AAbutPier | #186171 | Rebar labels missing in section details | 7 | 2004-06-08 |
| Answered | AAbutPier | #186166 | Foundation design | 11 | 2004-06-08 |
| Answered | AAbutPier | #186163 | Seismic analysis modeling | 26 | 2004-06-08 |
| Answered | AAbutPier | #186162 | Error after patch | 15 | 2004-06-08 |
| Answered | AAbutPier | #186178 | Hollow pier calculation report and drawings | 39 | 2004-06-08 |