Skip to content
AnsweredAAbutPierQ&A #1861062004-06-04 17:51 · Views 6

Allow approach slab to be split into two segments

skew 교량에서 접속슬래브의 끝단을 직으로 처리하는 경우 접속슬래브를 두 구간으로 나누는 경우도 있는 것으로 알고 있는데요... 추후에 이것도 가능케 해주셨으면 합니다.

Answer

안녕하세요. 한길아이티입니다. 현재 지원되지않는 사항입니다. 추후에 검토후 적용하도록 하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#186110Dimension lines not displayed correctly for pier102004-06-05
AnsweredAAbutPier#186105Wing wall reinforcement drawing52004-06-05
AnsweredAAbutPier#186095About the bridge bearing layout drawing162004-06-04
AnsweredAAbutPier#186087Wing wall dimensions152004-06-04
AnsweredAAbutPier#186106Allow approach slab to be split into two segments · Currently viewing62004-06-04
AnsweredAAbutPier#186102No slenderness ratio check202004-06-04
AnsweredAAbutPier#186094Requested corrections to drawings222004-06-04
AnsweredAAbutPier#186093About bearing location input152004-06-04
AnsweredAAbutPier#186086Cross slope not displayed correctly132004-06-04
AnsweredAAbutPier#186085Question about approach slab72004-06-04
AnsweredAAbutPier#186079Drawings are not generated62004-06-04
AnsweredAAbutPier#186072Drawing error when changing from mass foundation to pile foundation62004-06-04
AnsweredAAbutPier#186069Wall vertical rebar length202004-06-04
AnsweredAAbutPier#186058Please check102004-06-03
AnsweredAAbutPier#186052Coping beam rebar92004-06-03
AnsweredAAbutPier#186050File for the inquiry made by phone42004-06-03
AnsweredAAbutPier#186075Follow-up question about welding122004-06-03
AnsweredAAbutPier#186059Bearing capacity102004-06-03
AnsweredAAbutPier#186055Bearing capacity92004-06-03
AnsweredAAbutPier#186045Do not use the May 31 patch: critical error occurred132004-06-02
Sign in to ask