Skip to content
AnsweredAAbutPierQ&A #1859742004-05-31 11:30 · Views 11

Seismic question

확인바랍니다

Answer

안녕하세요. 한길아이티입니다. 내용은 전화로 말씀드렸습니다. 패치는 2:30분에 확인하시면 됩니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#185978Problems with widened bridge (multiple alignments)262004-05-31
AnsweredAAbutPier#185975When checking the foundation252004-05-31
AnsweredAAbutPier#185974Seismic question · Currently viewing112004-05-31
AnsweredAAbutPier#185971Safety factor in allowable pullout capacity292004-05-31
AnsweredAAbutPier#185965Internal program error during pier calculation212004-05-29
AnsweredAAbutPier#185964Abutment general drawing section error when changing from mass to pile212004-05-29
AnsweredAAbutPier#185960About seismic analysis212004-05-28
AnsweredAAbutPier#185959Problem outputting abutment reinforcement drawing172004-05-28
AnsweredAAbutPier#185957Showing rebar reinforcement range under bearing252004-05-28
AnsweredAAbutPier#185955Hollow pier (ASOLVER analysis problem)482004-05-27
AnsweredAAbutPier#185952Question about pier calculation422004-05-27
AnsweredAAbutPier#185932Error when generating drawings182004-05-27
AnsweredAAbutPier#185931Section force issue in plastic design172004-05-27
AnsweredAAbutPier#185936Question about pier column section check262004-05-27
AnsweredAAbutPier#185934Hollow pier (ASOLVER analysis does not run)182004-05-27
AnsweredAAbutPier#185929Internal error in pile check202004-05-27
AnsweredAAbutPier#185927Pi-shaped pier modeling analysis242004-05-26
AnsweredAAbutPier#185925Error during modeling analysis292004-05-26
AnsweredAAbutPier#185923Hollow section cross ties162004-05-26
AnsweredAAbutPier#185926Cannot edit figures in quantity report222004-05-26
Sign in to ask