Skip to content
AnsweredAAbutPierQ&A #1855832004-04-27 03:14 · Views 26

Quantity calculation report

수량산출서 기초지반선 표현시 E,L과 지반선이 중복됨.

Answer

안녕하세요. 한길아이티입니다. 수정해서 패치에 반영하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#185583Quantity calculation report · Currently viewing262004-04-27
AnsweredAAbutPier#185578Question on confinement rebar calculation442004-04-26
AnsweredAAbutPier#185577Questions about the drawings292004-04-26
AnsweredAAbutPier#185574Quantity82004-04-26
AnsweredAAbutPier#185573Pier report (seismic values)172004-04-26
AnsweredAAbutPier#185570To ***212004-04-24
AnsweredAAbutPier#185564About horizontal shear reinforcement172004-04-23
AnsweredAAbutPier#185566Abutment front view EL. and slope look wrong102004-04-23
AnsweredAAbutPier#185563Centroid calculation for pile rows102004-04-23
AnsweredAAbutPier#185558Values in the boring log112004-04-23
AnsweredAAbutPier#185553Namwon structure (EL difference)172004-04-22
AnsweredAAbutPier#185550Shear reinforcement and use of couplers332004-04-21
AnsweredAAbutPier#185545Comment on ABL value in wing wall plan input332004-04-20
AnsweredAAbutPier#185543Applying drawing numbers262004-04-20
AnsweredAAbutPier#185536Question462004-04-20
AnsweredAAbutPier#185521K (effective length factor) error542004-04-17
AnsweredAAbutPier#185515***162004-04-16
AnsweredAAbutPier#185519Drawing generation222004-04-16
AnsweredAAbutPier#185517SAP2000 error in seismic analysis model232004-04-16
AnsweredAAbutPier#185511Request to add shear rebar details202004-04-16
Sign in to ask