Rebar ratio for two-layer reinforcement in pier foundation
첨부파일의 교각1번은 하면철근을 2단으로 하여, 하면철근의 2단 철근갯수와 간격을 각각 L1=44/200 과 L1=88/100 으로 설정하여, 설계검토로 Puse 를 비교하였더니 Puse=0.00751 로 동일하게 계산되어 나옵니다. 하면의 2단에 배치된 철근의 갯수와 관계없이 Dia. 를 바꾸어야만 Puse 가 변화하는것 같습니다. 첨부된 파일안의 두개의 입력화일을 비교하여 검토해주시길 바랍니다.
Answer
안녕하세요. 한길아이티입니다. 수정하였습니다. 금일(2/27) 19시 이후에 패치를 받으시면 됩니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #184923 | About slab coordinates at the start abutment | 10 | 2004-03-02 |
| Answered | AAbutPier | #184919 | Horizontal displacement of steel pipe piles | 44 | 2004-03-02 |
| Answered | AAbutPier | #184926 | Notation of distance from parapet to shoe center | 15 | 2004-03-02 |
| Answered | AAbutPier | #184925 | Seismic-related question | 14 | 2004-03-02 |
| Answered | AAbutPier | #184918 | Pile design for foundation | 32 | 2004-03-02 |
| Answered | AAbutPier | #184917 | Generating SAP input for PSC beam bridge seismic analysis | 39 | 2004-02-29 |
| Answered | AAbutPier | #184915 | Section property input for PSC beam bridge seismic analysis | 29 | 2004-02-28 |
| Answered | AAbutPier | #184910 | Program won't launch | 22 | 2004-02-28 |
| Answered | AAbutPier | #184908 | Pier rebar quantity | 17 | 2004-02-28 |
| Answered | AAbutPier | #184899 | In foundation settings | 31 | 2004-02-27 |
| Answered | AAbutPier | #184898 | Can't proceed to the next step from here | 21 | 2004-02-27 |
| Answered | AAbutPier | #184894 | Values jump abnormally at pier expansion joint when placing PSC beams | 26 | 2004-02-27 |
| Answered | AAbutPier | #184896 | Program bug | 44 | 2004-02-27 |
| Answered | AAbutPier | #184895 | Pile cap beam design | 29 | 2004-02-27 |
| Answered | AAbutPier | #184892 | Can't proceed to pier foundation rebar | 25 | 2004-02-27 |
| Answered | AAbutPier | #184882 | Please review | 13 | 2004-02-26 |
| Answered | AAbutPier | #184890 | Rebar ratio for two-layer reinforcement in pier foundation · Currently viewing | 35 | 2004-02-26 |
| Answered | AAbutPier | #184887 | Abutment design environment input | 24 | 2004-02-26 |
| Answered | AAbutPier | #184886 | 4/3 factor in foundation section check | 19 | 2004-02-26 |
| Answered | AAbutPier | #184879 | Please review | 23 | 2004-02-26 |