Skip to content
AnsweredAAbutPierQ&A #1848792004-02-26 13:48 · Views 23

Please review

1.시점 및 횡단구성에서 SKEW교량에 곡선교량일 경우 입력 도면을 첨부하오니 검토 바랍니다

Answer

안녕하세요. 한길아이티입니다. 전화로 말씀드렸습니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#184923About slab coordinates at the start abutment102004-03-02
AnsweredAAbutPier#184919Horizontal displacement of steel pipe piles442004-03-02
AnsweredAAbutPier#184926Notation of distance from parapet to shoe center152004-03-02
AnsweredAAbutPier#184925Seismic-related question142004-03-02
AnsweredAAbutPier#184918Pile design for foundation322004-03-02
AnsweredAAbutPier#184917Generating SAP input for PSC beam bridge seismic analysis392004-02-29
AnsweredAAbutPier#184915Section property input for PSC beam bridge seismic analysis292004-02-28
AnsweredAAbutPier#184910Program won't launch222004-02-28
AnsweredAAbutPier#184908Pier rebar quantity172004-02-28
AnsweredAAbutPier#184899In foundation settings312004-02-27
AnsweredAAbutPier#184898Can't proceed to the next step from here212004-02-27
AnsweredAAbutPier#184894Values jump abnormally at pier expansion joint when placing PSC beams262004-02-27
AnsweredAAbutPier#184896Program bug442004-02-27
AnsweredAAbutPier#184895Pile cap beam design292004-02-27
AnsweredAAbutPier#184892Can't proceed to pier foundation rebar252004-02-27
AnsweredAAbutPier#184882Please review132004-02-26
AnsweredAAbutPier#184890Rebar ratio for two-layer reinforcement in pier foundation352004-02-26
AnsweredAAbutPier#184887Abutment design environment input242004-02-26
AnsweredAAbutPier#1848864/3 factor in foundation section check192004-02-26
AnsweredAAbutPier#184879Please review · Currently viewing232004-02-26
Sign in to ask