Skip to content
AnsweredAAbutPierQ&A #1848542004-02-24 14:16 · Views 23

Question

화일첨부하여 올립니다. 건강 조심하시고 즐거은 하루보내세요

Answer

안녕하세요. 한길아이티입니다. 수정하였습니다. 금일(2/25) 오전 11시 30분 이후에 패치를 다운 받으시면 됩니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#184874Main rebar diameter for pier foundation reinforcement detailing332004-02-26
AnsweredAAbutPier#184873About drawing output192004-02-26
AnsweredAAbutPier#184871Longitudinal profile: grade difference between abutment and slab...262004-02-26
AnsweredAAbutPier#184870Question about pile cap beam design372004-02-26
AnsweredAAbutPier#184866Problem saving and opening foundation data232004-02-25
AnsweredAAbutPier#184855Tried the method you described below, but nothing changed172004-02-25
AnsweredAAbutPier#184854Question · Currently viewing232004-02-24
AnsweredAAbutPier#184849Pier reinforcement drawing...202004-02-24
AnsweredAAbutPier#184843About automatic girder placement202004-02-24
AnsweredAAbutPier#184837Bridge bearing concrete blocks cannot be set as a single block242004-02-24
AnsweredAAbutPier#184839Font style312004-02-23
AnsweredAAbutPier#184833Earthwork quantity202004-02-23
AnsweredAAbutPier#184830Earthwork262004-02-23
AnsweredAAbutPier#184827In the coping section check...722004-02-21
AnsweredAAbutPier#184825Bridge bearing check782004-02-21
AnsweredAAbutPier#184824Drawing generation and wing wall angle742004-02-21
AnsweredAAbutPier#184823Input for hollow piers692004-02-21
AnsweredAAbutPier#184819Seismic672004-02-21
AnsweredAAbutPier#184818Pile length input612004-02-21
AnsweredAAbutPier#184817Seismic analysis selection502004-02-21
Sign in to ask