Earthwork quantity
토공수량에서 줄떼추가공제량은 고려가 안되나여...
Answer
안녕하세요. 한길아이티입니다. 줄떼공제는 현재 적용이 되지않고 있습니다. 검토후 반영하도록 하겠습니다. 적용일정은 홈페이지의 업그레이드 예정항목에 추후에 공지하도록 하겠습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #184874 | Main rebar diameter for pier foundation reinforcement detailing | 33 | 2004-02-26 |
| Answered | AAbutPier | #184873 | About drawing output | 19 | 2004-02-26 |
| Answered | AAbutPier | #184871 | Longitudinal profile: grade difference between abutment and slab... | 26 | 2004-02-26 |
| Answered | AAbutPier | #184870 | Question about pile cap beam design | 37 | 2004-02-26 |
| Answered | AAbutPier | #184866 | Problem saving and opening foundation data | 23 | 2004-02-25 |
| Answered | AAbutPier | #184855 | Tried the method you described below, but nothing changed | 17 | 2004-02-25 |
| Answered | AAbutPier | #184854 | Question | 23 | 2004-02-24 |
| Answered | AAbutPier | #184849 | Pier reinforcement drawing... | 20 | 2004-02-24 |
| Answered | AAbutPier | #184843 | About automatic girder placement | 20 | 2004-02-24 |
| Answered | AAbutPier | #184837 | Bridge bearing concrete blocks cannot be set as a single block | 24 | 2004-02-24 |
| Answered | AAbutPier | #184839 | Font style | 31 | 2004-02-23 |
| Answered | AAbutPier | #184833 | Earthwork quantity · Currently viewing | 20 | 2004-02-23 |
| Answered | AAbutPier | #184830 | Earthwork | 26 | 2004-02-23 |
| Answered | AAbutPier | #184827 | In the coping section check... | 72 | 2004-02-21 |
| Answered | AAbutPier | #184825 | Bridge bearing check | 78 | 2004-02-21 |
| Answered | AAbutPier | #184824 | Drawing generation and wing wall angle | 74 | 2004-02-21 |
| Answered | AAbutPier | #184823 | Input for hollow piers | 69 | 2004-02-21 |
| Answered | AAbutPier | #184819 | Seismic | 67 | 2004-02-21 |
| Answered | AAbutPier | #184818 | Pile length input | 61 | 2004-02-21 |
| Answered | AAbutPier | #184817 | Seismic analysis selection | 50 | 2004-02-21 |