Skip to content
AnsweredAAbutPierQ&A #1834512003-11-12 00:08 · Views 52

Slab dimension input

1. 슬래브제원입력 지점2,5에서 셀을 삭제후 수정해도 바뀌지 않습니다. 2. 교대 지반정보입력의 횡단지반입력을 어떻게 사용하는지 알고싶습니다. 부탁드립니다.

Answer

안녕하세요. 한길아이티입니다. 전화로 설명드렸습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#183451Slab dimension input · Currently viewing522003-11-12
AnsweredAAbutPier#183446About quantity calculation552003-11-11
AnsweredAAbutPier#183439Error during ASolver calculation462003-11-11
AnsweredAAbutPier#183435Pier column width differs from coping width (file attached)472003-11-11
AnsweredAAbutPier#183422Something odd in the approach slab quantities592003-11-10
AnsweredAAbutPier#183407Question about required main rebar area552003-11-10
AnsweredAAbutPier#183429Pier column width differs from coping width462003-11-10
AnsweredAAbutPier#183427Follow-up question542003-11-10
AnsweredAAbutPier#183426Pi-shaped rigid frame pier (separate foundations)542003-11-10
AnsweredAAbutPier#183425Requesting a reply542003-11-10
AnsweredAAbutPier#183411Section area error in wind load calculation702003-11-10
AnsweredAAbutPier#183409Abutment (bearing seat dimensions), Π-shaped pier (foundation settings)632003-11-10
AnsweredAAbutPier#183388Cross slope setting for individual abutment input552003-11-07
AnsweredAAbutPier#183374Please check462003-11-06
AnsweredAAbutPier#183372Question about quantity calculation512003-11-06
AnsweredAAbutPier#183381Please check542003-11-06
AnsweredAAbutPier#183368Please review again742003-11-06
AnsweredAAbutPier#183365End-side abutment is placed reversed482003-11-06
AnsweredAAbutPier#183350Correction needed452003-11-05
AnsweredAAbutPier#183349Elevations do not match502003-11-05
Sign in to ask