Question in Korean (English title coming soon)
구조해석시 지반스프링계수값이 상시와 내진설계시 동일하게 입력되어 해석 됨. (계산서 또한 스프링계수값이 상시와내진시 동일하게 나타남.)
Answer
안녕하세요. 한길아이티입니다. 오류를 확인하였습니다. 수정하여 오늘자 패치에 반영하겠습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | ACulvert | #268543 | Pile calculation report | 327 | 2026-09-28 |
| Answered | ACulvert | #268536 | Setting section changes in culvert | 166 | 2026-09-28 |
| Answered | ACulvert | #268524 | Design check not performed at wall center | 215 | 2026-09-27 |
| Answered | ACulvert | #268523 | Applying moving vehicle loads | 231 | 2026-09-27 |
| Answered | ACulvert | #268522 | Question about pile layout | 257 | 2026-09-23 |
| Answered | ACulvert | #268521 | Question about features | 128 | 2026-09-23 |
| Answered | ACulvert | #268510 | Question about joint check in Excel report output | 180 | 2026-09-22 |
| Answered | ACulvert | #268499 | Error in STM analysis of corner region | 139 | 2026-09-22 |
| Answered | ACulvert | #268471 | Launching the culvert program | 59 | 2026-09-18 |
| Answered | ACulvert | #268442 | All lines are displayed as dashed lines, what should I do? | 137 | 2026-09-17 |
| Answered | ACulvert | #268429 | Question about U-type underpass | 125 | 2026-09-17 |
| Answered | ACulvert | #268424 | Load position when applying railway loads to an underpass | 230 | 2026-09-17 |
| Answered | ACulvert | #268417 | Changing girder dimensions | 146 | 2026-09-17 |
| Answered | ACulvert | #268396 | Incorrect section check location for horizontal rebar | 173 | 2026-09-16 |
| Answered | ACulvert | #268376 | Question about segment settings for U-type retaining wall | 185 | 2026-09-15 |
| Answered | ACulvert | #268343 | Question about culvert drawing output | 126 | 2026-09-15 |
| Answered | ACulvert | #268337 | Inquiry about checking retaining-wall-type wing walls | 300 | 2026-09-14 |
| Answered | ACulvert | #268330 | About drawing output | 150 | 2026-09-14 |
| Answered | ACulvert | #268318 | Some blocks not displayed | 135 | 2026-09-14 |
| Answered | ACulvert | #268317 | Tank load for surcharge and moving loads | 334 | 2026-09-14 |