AnsweredACulvertQ&A #2275782006-02-03 14:22 · Views 69

Question in Korean (English title coming soon)

주철근 2cycle 철근배근시 상부슬래브에 하면, 하부슬래브에 상면은 철근 이음을 놓을수 없나요 이음을 넣으려면 어떻게 해야하나요? 확인부탁드립니다

Answer

안녕하세요. 한길아이티입니다. 2cycle 선택후 철근,연결 이음 버튼을 누르시면 각 부재의 이음수를 줄 수 있습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredACulvert#268543Pile calculation report3272026-09-28
AnsweredACulvert#268536Setting section changes in culvert1662026-09-28
AnsweredACulvert#268524Design check not performed at wall center2152026-09-27
AnsweredACulvert#268523Applying moving vehicle loads2312026-09-27
AnsweredACulvert#268522Question about pile layout2592026-09-23
AnsweredACulvert#268521Question about features1282026-09-23
AnsweredACulvert#268510Question about joint check in Excel report output1802026-09-22
AnsweredACulvert#268499Error in STM analysis of corner region1392026-09-22
AnsweredACulvert#268471Launching the culvert program592026-09-18
AnsweredACulvert#268442All lines are displayed as dashed lines, what should I do?1372026-09-17
AnsweredACulvert#268429Question about U-type underpass1262026-09-17
AnsweredACulvert#268424Load position when applying railway loads to an underpass2302026-09-17
AnsweredACulvert#268417Changing girder dimensions1472026-09-17
AnsweredACulvert#268396Incorrect section check location for horizontal rebar1732026-09-16
AnsweredACulvert#268376Question about segment settings for U-type retaining wall1852026-09-15
AnsweredACulvert#268343Question about culvert drawing output1262026-09-15
AnsweredACulvert#268337Inquiry about checking retaining-wall-type wing walls3002026-09-14
AnsweredACulvert#268330About drawing output1502026-09-14
AnsweredACulvert#268318Some blocks not displayed1352026-09-14
AnsweredACulvert#268317Tank load for surcharge and moving loads3342026-09-14
Sign in to ask