Skip to content
AnsweredACulvertQ&A #2274502006-01-11 02:23 · Views 116

Question in Korean (English title coming soon)

전화드린[개인정보]입니다. 두개파일을 보내드립니다. 1련과 3련이구요 1련은 case6에 활하중에의한수평토압이 고려돼는데 3련은 고려가 안되네요 바로좀 부탁드리겠습니다. 수고하세요

Answer

안녕하세요. 한길아이티입니다. 전화상으로 답변 드렸습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredACulvert#268543Pile calculation report3272026-09-28
AnsweredACulvert#268536Setting section changes in culvert1662026-09-28
AnsweredACulvert#268524Design check not performed at wall center2152026-09-27
AnsweredACulvert#268523Applying moving vehicle loads2312026-09-27
AnsweredACulvert#268522Question about pile layout2592026-09-23
AnsweredACulvert#268521Question about features1282026-09-23
AnsweredACulvert#268510Question about joint check in Excel report output1802026-09-22
AnsweredACulvert#268499Error in STM analysis of corner region1392026-09-22
AnsweredACulvert#268471Launching the culvert program592026-09-18
AnsweredACulvert#268442All lines are displayed as dashed lines, what should I do?1372026-09-17
AnsweredACulvert#268429Question about U-type underpass1262026-09-17
AnsweredACulvert#268424Load position when applying railway loads to an underpass2302026-09-17
AnsweredACulvert#268417Changing girder dimensions1472026-09-17
AnsweredACulvert#268396Incorrect section check location for horizontal rebar1732026-09-16
AnsweredACulvert#268376Question about segment settings for U-type retaining wall1852026-09-15
AnsweredACulvert#268343Question about culvert drawing output1262026-09-15
AnsweredACulvert#268337Inquiry about checking retaining-wall-type wing walls3002026-09-14
AnsweredACulvert#268330About drawing output1502026-09-14
AnsweredACulvert#268318Some blocks not displayed1352026-09-14
AnsweredACulvert#268317Tank load for surcharge and moving loads3342026-09-14
Sign in to ask