Question in Korean (English title coming soon)
acl파일, 계산서 내부 모두 SI단위인데 계산서안의 하중재하도상의 삽도들.. 그중에서도 차량하중, 탱크하중, 트레일러하중은 일단 CGS로 나와서 잘못된거 같고.. 딴것도 혹시 모르니 확인 부탁드립니다.
Answer
안녕하세요. 한길아이티입니다. SI단위시 차량 하중,탱크하중,트레일러 하중재하도에 CGS단위로 표현되는 오류를 확인하였습니다. 수정후 금일 패치에 적용하도록 하겠습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | ACulvert | #268543 | Pile calculation report | 327 | 2026-09-28 |
| Answered | ACulvert | #268536 | Setting section changes in culvert | 166 | 2026-09-28 |
| Answered | ACulvert | #268524 | Design check not performed at wall center | 215 | 2026-09-27 |
| Answered | ACulvert | #268523 | Applying moving vehicle loads | 232 | 2026-09-27 |
| Answered | ACulvert | #268522 | Question about pile layout | 260 | 2026-09-23 |
| Answered | ACulvert | #268521 | Question about features | 128 | 2026-09-23 |
| Answered | ACulvert | #268510 | Question about joint check in Excel report output | 180 | 2026-09-22 |
| Answered | ACulvert | #268499 | Error in STM analysis of corner region | 139 | 2026-09-22 |
| Answered | ACulvert | #268471 | Launching the culvert program | 59 | 2026-09-18 |
| Answered | ACulvert | #268442 | All lines are displayed as dashed lines, what should I do? | 138 | 2026-09-17 |
| Answered | ACulvert | #268429 | Question about U-type underpass | 126 | 2026-09-17 |
| Answered | ACulvert | #268424 | Load position when applying railway loads to an underpass | 230 | 2026-09-17 |
| Answered | ACulvert | #268417 | Changing girder dimensions | 147 | 2026-09-17 |
| Answered | ACulvert | #268396 | Incorrect section check location for horizontal rebar | 173 | 2026-09-16 |
| Answered | ACulvert | #268376 | Question about segment settings for U-type retaining wall | 185 | 2026-09-15 |
| Answered | ACulvert | #268343 | Question about culvert drawing output | 126 | 2026-09-15 |
| Answered | ACulvert | #268337 | Inquiry about checking retaining-wall-type wing walls | 300 | 2026-09-14 |
| Answered | ACulvert | #268330 | About drawing output | 150 | 2026-09-14 |
| Answered | ACulvert | #268318 | Some blocks not displayed | 135 | 2026-09-14 |
| Answered | ACulvert | #268317 | Tank load for surcharge and moving loads | 334 | 2026-09-14 |