Skip to content
AnsweredACulvertQ&A #2272832005-12-07 20:11 · Views 26

Question in Korean (English title coming soon)

토공수량 산출시 0~2m 2~4m 4~6m 이런 식으로 나뉘어 나와야 하는데 현재는 그렇게 출력이 안되는건지 알고 싶습니다

Answer

안녕하세요. 한길아이티입니다. 현재는 전체 수량에 대하여 토공을 출력하고 있습니다.말씀하신대로 m별 분류하여 산출하여 출력되도록 하겠으며,금주 안으로 패치에 적용토록 하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredACulvert#268543Pile calculation report3282026-09-28
AnsweredACulvert#268536Setting section changes in culvert1672026-09-28
AnsweredACulvert#268524Design check not performed at wall center2152026-09-27
AnsweredACulvert#268523Applying moving vehicle loads2322026-09-27
AnsweredACulvert#268522Question about pile layout2612026-09-23
AnsweredACulvert#268521Question about features1282026-09-23
AnsweredACulvert#268510Question about joint check in Excel report output1802026-09-22
AnsweredACulvert#268499Error in STM analysis of corner region1402026-09-22
AnsweredACulvert#268471Launching the culvert program592026-09-18
AnsweredACulvert#268442All lines are displayed as dashed lines, what should I do?1382026-09-17
AnsweredACulvert#268429Question about U-type underpass1262026-09-17
AnsweredACulvert#268424Load position when applying railway loads to an underpass2302026-09-17
AnsweredACulvert#268417Changing girder dimensions1472026-09-17
AnsweredACulvert#268396Incorrect section check location for horizontal rebar1742026-09-16
AnsweredACulvert#268376Question about segment settings for U-type retaining wall1852026-09-15
AnsweredACulvert#268343Question about culvert drawing output1262026-09-15
AnsweredACulvert#268337Inquiry about checking retaining-wall-type wing walls3002026-09-14
AnsweredACulvert#268330About drawing output1502026-09-14
AnsweredACulvert#268318Some blocks not displayed1362026-09-14
AnsweredACulvert#268317Tank load for surcharge and moving loads3342026-09-14
Sign in to ask
Question in Korean (English title coming soon) · aroad