AnsweredACulvertQ&A #2271892005-11-28 20:49 · Views 33

Question in Korean (English title coming soon)

옹벽 배근시 2단철근을 배치 하는데요 1cycle 철근에서 2단철근이 z짜로 배근이 됩니다.. 빠근 답편 바랍니다

Answer

안녕하세요. 한길아이티입니다. 오류를 확인하였습니다. 수정후 패치에 적용하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredACulvert#268543Pile calculation report3282026-09-28
AnsweredACulvert#268536Setting section changes in culvert1682026-09-28
AnsweredACulvert#268524Design check not performed at wall center2152026-09-27
AnsweredACulvert#268523Applying moving vehicle loads2332026-09-27
AnsweredACulvert#268522Question about pile layout2612026-09-23
AnsweredACulvert#268521Question about features1282026-09-23
AnsweredACulvert#268510Question about joint check in Excel report output1812026-09-22
AnsweredACulvert#268499Error in STM analysis of corner region1402026-09-22
AnsweredACulvert#268471Launching the culvert program592026-09-18
AnsweredACulvert#268442All lines are displayed as dashed lines, what should I do?1382026-09-17
AnsweredACulvert#268429Question about U-type underpass1262026-09-17
AnsweredACulvert#268424Load position when applying railway loads to an underpass2302026-09-17
AnsweredACulvert#268417Changing girder dimensions1472026-09-17
AnsweredACulvert#268396Incorrect section check location for horizontal rebar1762026-09-16
AnsweredACulvert#268376Question about segment settings for U-type retaining wall1852026-09-15
AnsweredACulvert#268343Question about culvert drawing output1272026-09-15
AnsweredACulvert#268337Inquiry about checking retaining-wall-type wing walls3012026-09-14
AnsweredACulvert#268330About drawing output1512026-09-14
AnsweredACulvert#268318Some blocks not displayed1362026-09-14
AnsweredACulvert#268317Tank load for surcharge and moving loads3352026-09-14
Sign in to ask