AnsweredACulvertQ&A #2269572005-10-29 00:42 · Views 74

Designing an underpass

1. 주철근배치시 단면이음수를 상.하면 각각 2개씩 설정을 하니 모델 표현이 안됩니다. 2. 계산서 출력이 안됩니다. 3. 2사이클벽체에 이음을 주고싶은데 어떻게 해야하나요? 빠른 답변바라겠습니다. 수고하십시요.

Answer

안녕하세요. 한길아이티입니다. 전화상으로 말씀 드렸습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredACulvert#268543Pile calculation report3292026-09-28
AnsweredACulvert#268536Setting section changes in culvert1702026-09-28
AnsweredACulvert#268524Design check not performed at wall center2152026-09-27
AnsweredACulvert#268523Applying moving vehicle loads2342026-09-27
AnsweredACulvert#268522Question about pile layout2612026-09-23
AnsweredACulvert#268521Question about features1292026-09-23
AnsweredACulvert#268510Question about joint check in Excel report output1812026-09-22
AnsweredACulvert#268499Error in STM analysis of corner region1422026-09-22
AnsweredACulvert#268471Launching the culvert program592026-09-18
AnsweredACulvert#268442All lines are displayed as dashed lines, what should I do?1382026-09-17
AnsweredACulvert#268429Question about U-type underpass1262026-09-17
AnsweredACulvert#268424Load position when applying railway loads to an underpass2322026-09-17
AnsweredACulvert#268417Changing girder dimensions1472026-09-17
AnsweredACulvert#268396Incorrect section check location for horizontal rebar1772026-09-16
AnsweredACulvert#268376Question about segment settings for U-type retaining wall1882026-09-15
AnsweredACulvert#268343Question about culvert drawing output1272026-09-15
AnsweredACulvert#268337Inquiry about checking retaining-wall-type wing walls3012026-09-14
AnsweredACulvert#268330About drawing output1512026-09-14
AnsweredACulvert#268318Some blocks not displayed1362026-09-14
AnsweredACulvert#268317Tank load for surcharge and moving loads3352026-09-14
Sign in to ask