Display issue
전화 얘기대로 자료를 올립니다...
Answer
안녕하세요. 한길아이티입니다. 기초부 배근의 상면입력을 수정하셔야 합니다. 구간배치가 부족하게 되어있습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #183003 | Please fix (restarting - 10) | 47 | 2003-10-15 |
| Answered | AAbutPier | #182998 | Problem in reinforcement drawing | 48 | 2003-10-15 |
| Answered | AAbutPier | #182996 | Quantity calculation report | 48 | 2003-10-15 |
| Answered | AAbutPier | #182995 | Please check RC slab data | 60 | 2003-10-15 |
| Answered | AAbutPier | #182994 | Step in pier cap drawing doesn't seem to be shown | 50 | 2003-10-15 |
| Answered | AAbutPier | #182991 | Thanks for the previous answer, another problem | 46 | 2003-10-15 |
| Answered | AAbutPier | #182987 | Bearing area rebar not shown | 43 | 2003-10-15 |
| Answered | AAbutPier | #182968 | Moving abutment section input to the road centerline | 41 | 2003-10-14 |
| Answered | AAbutPier | #182967 | Question | 48 | 2003-10-14 |
| Answered | AAbutPier | #182961 | Approach slab rebar not displayed | 46 | 2003-10-14 |
| Answered | AAbutPier | #182984 | Please fix (restarting - 9) | 48 | 2003-10-14 |
| Answered | AAbutPier | #182958 | About the rebar reinforcement drawing... | 91 | 2003-10-14 |
| Answered | AAbutPier | #182971 | Please fix this (restarting - 7) | 67 | 2003-10-14 |
| Answered | AAbutPier | #182951 | Awaiting reply | 42 | 2003-10-14 |
| Answered | AAbutPier | #182948 | Column main rebar design check screen (added since another problem appeared) | 38 | 2003-10-14 |
| Answered | AAbutPier | #182946 | Question | 45 | 2003-10-13 |
| Answered | AAbutPier | #182942 | Column tie bar diameter does not change in design check | 32 | 2003-10-13 |
| Answered | AAbutPier | #182935 | Display issue · Currently viewing | 36 | 2003-10-13 |
| Answered | AAbutPier | #182922 | Pier spread footing section forces and wing wall reinforcement detailing... | 38 | 2003-10-12 |
| Answered | AAbutPier | #182921 | Quantity calculation report... | 40 | 2003-10-12 |