Skip to content
AnsweredAAbutPierQ&A #1829352003-10-13 20:34 · Views 36

Display issue

전화 얘기대로 자료를 올립니다...

Answer

안녕하세요. 한길아이티입니다. 기초부 배근의 상면입력을 수정하셔야 합니다. 구간배치가 부족하게 되어있습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#183003Please fix (restarting - 10)472003-10-15
AnsweredAAbutPier#182998Problem in reinforcement drawing482003-10-15
AnsweredAAbutPier#182996Quantity calculation report482003-10-15
AnsweredAAbutPier#182995Please check RC slab data602003-10-15
AnsweredAAbutPier#182994Step in pier cap drawing doesn't seem to be shown502003-10-15
AnsweredAAbutPier#182991Thanks for the previous answer, another problem462003-10-15
AnsweredAAbutPier#182987Bearing area rebar not shown432003-10-15
AnsweredAAbutPier#182968Moving abutment section input to the road centerline412003-10-14
AnsweredAAbutPier#182967Question482003-10-14
AnsweredAAbutPier#182961Approach slab rebar not displayed462003-10-14
AnsweredAAbutPier#182984Please fix (restarting - 9)482003-10-14
AnsweredAAbutPier#182958About the rebar reinforcement drawing...912003-10-14
AnsweredAAbutPier#182971Please fix this (restarting - 7)672003-10-14
AnsweredAAbutPier#182951Awaiting reply422003-10-14
AnsweredAAbutPier#182948Column main rebar design check screen (added since another problem appeared)382003-10-14
AnsweredAAbutPier#182946Question452003-10-13
AnsweredAAbutPier#182942Column tie bar diameter does not change in design check322003-10-13
AnsweredAAbutPier#182935Display issue · Currently viewing362003-10-13
AnsweredAAbutPier#182922Pier spread footing section forces and wing wall reinforcement detailing...382003-10-12
AnsweredAAbutPier#182921Quantity calculation report...402003-10-12
Sign in to ask