Skip to content
AnsweredACulvertQ&A #2268122005-10-10 19:39 · Views 48

Retaining wall shear rebar

옹벽의 전단철근을 500으로 배근하려고하는데 5높이의 전단철근은 ctc 250으로 배근되는것 같습니다. 검토바랍니다.

Answer

안녕하세요. 한길아이티입니다. 오류를 확인하였습니다. 수정후 패치에 적용하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredACulvert#268543Pile calculation report3292026-09-28
AnsweredACulvert#268536Setting section changes in culvert1712026-09-28
AnsweredACulvert#268524Design check not performed at wall center2152026-09-27
AnsweredACulvert#268523Applying moving vehicle loads2352026-09-27
AnsweredACulvert#268522Question about pile layout2612026-09-23
AnsweredACulvert#268521Question about features1292026-09-23
AnsweredACulvert#268510Question about joint check in Excel report output1832026-09-22
AnsweredACulvert#268499Error in STM analysis of corner region1422026-09-22
AnsweredACulvert#268471Launching the culvert program592026-09-18
AnsweredACulvert#268442All lines are displayed as dashed lines, what should I do?1382026-09-17
AnsweredACulvert#268429Question about U-type underpass1262026-09-17
AnsweredACulvert#268424Load position when applying railway loads to an underpass2332026-09-17
AnsweredACulvert#268417Changing girder dimensions1482026-09-17
AnsweredACulvert#268396Incorrect section check location for horizontal rebar1772026-09-16
AnsweredACulvert#268376Question about segment settings for U-type retaining wall1882026-09-15
AnsweredACulvert#268343Question about culvert drawing output1282026-09-15
AnsweredACulvert#268337Inquiry about checking retaining-wall-type wing walls3032026-09-14
AnsweredACulvert#268330About drawing output1512026-09-14
AnsweredACulvert#268318Some blocks not displayed1382026-09-14
AnsweredACulvert#268317Tank load for surcharge and moving loads3352026-09-14
Sign in to ask