AnsweredACulvertQ&A #2265742005-09-08 23:42 · Views 28

Spring spacing for double-cell culvert

2련암거에서 스프링간격이 입력값과 다르게 입력됩니다 검토 부탁드립니다

Answer

안녕하세요. 한길아이티입니다. 수식 계산시 적용 오류가 있었습니다.수정하여 패치에 적용토록 하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredACulvert#226610Please review432005-09-13
AnsweredACulvert#226602About calculation report output262005-09-12
AnsweredACulvert#226608About the calculation report 2662005-09-12
AnsweredACulvert#226598Rigid zone calculation322005-09-12
AnsweredACulvert#226606Calculation report output522005-09-12
AnsweredACulvert#226594Mismatch in foundation bearing capacity check results222005-09-12
AnsweredACulvert#226603Regarding the calculation report output below322005-09-12
AnsweredACulvert#226599Difference in subgrade reaction coefficient values302005-09-12
AnsweredACulvert#226593About the retaining-wall-type wing wall calculation report262005-09-11
AnsweredACulvert#226592Roadway section reinforcement detailing is not enabled262005-09-10
AnsweredACulvert#226590Retaining-wall-type wing wall calculation report262005-09-10
AnsweredACulvert#226587Uploading the file182005-09-09
AnsweredACulvert#226584Please check dimensions in skewed reinforcement drawing232005-09-09
AnsweredACulvert#226586Problem in wing wall rebar material table202005-09-09
AnsweredACulvert#226577Calculation report error252005-09-09
AnsweredACulvert#226576SAP input data generation error342005-09-09
AnsweredACulvert#226574Spring spacing for double-cell culvert · Currently viewing282005-09-08
AnsweredACulvert#226571Please review412005-09-08
AnsweredACulvert#226579Drawing frame file382005-09-08
AnsweredACulvert#226572Additional note to post 1961 below262005-09-08
Sign in to ask