AnsweredACulvertQ&A #2263632005-07-29 20:51 · Views 56

Inquiry about culvert vertical earth pressure increase factor

암거2개가 토피가 다른데 할증계수의 값이 같아서 파일2개를 올립니다.

Answer

안녕하세요. 한길아이티입니다. 1. 토피 0.75m => 1 + 0.2 * 0.75/4.3 = 1.0348 : 소수점 3자리에서 반올림 처리 ( 1.035 ) 2. 토피 0.45m => 1 + 0.2 * 0.45/2.6 = 1.0346 : 소수점 3자리에서 반올림 처리 ( 1.035 ) 2개의 암거가 동일한 값이 출력되는게 맞습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredACulvert#226364Inquiry about vertical earth pressure increase factor 2472005-07-29
AnsweredACulvert#226363Inquiry about culvert vertical earth pressure increase factor · Currently viewing562005-07-29
AnsweredACulvert#226362Cannot change wall distribution rebar502005-07-29
AnsweredACulvert#226360Why does this happen?362005-07-29
AnsweredACulvert#226358Wing wall reinforcement detailing322005-07-29
AnsweredACulvert#226356Drawings are not generated302005-07-29
AnsweredACulvert#226355In basic data input712005-07-28
AnsweredACulvert#226353Allowable bearing capacity check852005-07-28
AnsweredACulvert#226351Error message during buoyancy check362005-07-28
AnsweredACulvert#226349Formula issue in pile check (seismic)402005-07-27
AnsweredACulvert#226347Please check362005-07-27
AnsweredACulvert#226345Suggested improvements912005-07-26
AnsweredACulvert#226339Bearing capacity check for channel box462005-07-22
AnsweredACulvert#226342Bracket402005-07-22
AnsweredACulvert#226340Distribution rebar in approach slab392005-07-22
AnsweredACulvert#226337Design lane width772005-07-22
AnsweredACulvert#226335Bearing capacity check for channel box522005-07-22
AnsweredACulvert#226333About the basic data input482005-07-19
AnsweredACulvert#226331Please check312005-07-18
AnsweredACulvert#226329Lap splices in the 2nd cycle312005-07-18
Sign in to ask