Inquiry about culvert vertical earth pressure increase factor
암거2개가 토피가 다른데 할증계수의 값이 같아서 파일2개를 올립니다.
Answer
안녕하세요. 한길아이티입니다. 1. 토피 0.75m => 1 + 0.2 * 0.75/4.3 = 1.0348 : 소수점 3자리에서 반올림 처리 ( 1.035 ) 2. 토피 0.45m => 1 + 0.2 * 0.45/2.6 = 1.0346 : 소수점 3자리에서 반올림 처리 ( 1.035 ) 2개의 암거가 동일한 값이 출력되는게 맞습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | ACulvert | #268543 | Pile calculation report | 329 | 2026-09-28 |
| Answered | ACulvert | #268536 | Setting section changes in culvert | 173 | 2026-09-28 |
| Answered | ACulvert | #268524 | Design check not performed at wall center | 216 | 2026-09-27 |
| Answered | ACulvert | #268523 | Applying moving vehicle loads | 237 | 2026-09-27 |
| Answered | ACulvert | #268522 | Question about pile layout | 261 | 2026-09-23 |
| Answered | ACulvert | #268521 | Question about features | 130 | 2026-09-23 |
| Answered | ACulvert | #268510 | Question about joint check in Excel report output | 184 | 2026-09-22 |
| Answered | ACulvert | #268499 | Error in STM analysis of corner region | 143 | 2026-09-22 |
| Answered | ACulvert | #268471 | Launching the culvert program | 59 | 2026-09-18 |
| Answered | ACulvert | #268442 | All lines are displayed as dashed lines, what should I do? | 139 | 2026-09-17 |
| Answered | ACulvert | #268429 | Question about U-type underpass | 126 | 2026-09-17 |
| Answered | ACulvert | #268424 | Load position when applying railway loads to an underpass | 237 | 2026-09-17 |
| Answered | ACulvert | #268417 | Changing girder dimensions | 152 | 2026-09-17 |
| Answered | ACulvert | #268396 | Incorrect section check location for horizontal rebar | 183 | 2026-09-16 |
| Answered | ACulvert | #268376 | Question about segment settings for U-type retaining wall | 191 | 2026-09-15 |
| Answered | ACulvert | #268343 | Question about culvert drawing output | 128 | 2026-09-15 |
| Answered | ACulvert | #268337 | Inquiry about checking retaining-wall-type wing walls | 306 | 2026-09-14 |
| Answered | ACulvert | #268330 | About drawing output | 153 | 2026-09-14 |
| Answered | ACulvert | #268318 | Some blocks not displayed | 139 | 2026-09-14 |
| Answered | ACulvert | #268317 | Tank load for surcharge and moving loads | 338 | 2026-09-14 |