Lap splices in the 2nd cycle
벽체 배근도상에 2cycle 겹이음이 표현이 안되어 있기때문에 수정하여 패치에 적용하신다고 하셨는데 언제쯤 가능한가여...
Answer
안녕하세요. 한길아이티입니다. 늦어져서 죄송합니다.현재 수정이 완료된 상태이며 금일 패치에 적용하도록 하겠습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | ACulvert | #226364 | Inquiry about vertical earth pressure increase factor 2 | 47 | 2005-07-29 |
| Answered | ACulvert | #226363 | Inquiry about culvert vertical earth pressure increase factor | 56 | 2005-07-29 |
| Answered | ACulvert | #226362 | Cannot change wall distribution rebar | 50 | 2005-07-29 |
| Answered | ACulvert | #226360 | Why does this happen? | 36 | 2005-07-29 |
| Answered | ACulvert | #226358 | Wing wall reinforcement detailing | 32 | 2005-07-29 |
| Answered | ACulvert | #226356 | Drawings are not generated | 30 | 2005-07-29 |
| Answered | ACulvert | #226355 | In basic data input | 71 | 2005-07-28 |
| Answered | ACulvert | #226353 | Allowable bearing capacity check | 85 | 2005-07-28 |
| Answered | ACulvert | #226351 | Error message during buoyancy check | 36 | 2005-07-28 |
| Answered | ACulvert | #226349 | Formula issue in pile check (seismic) | 40 | 2005-07-27 |
| Answered | ACulvert | #226347 | Please check | 36 | 2005-07-27 |
| Answered | ACulvert | #226345 | Suggested improvements | 91 | 2005-07-26 |
| Answered | ACulvert | #226339 | Bearing capacity check for channel box | 46 | 2005-07-22 |
| Answered | ACulvert | #226342 | Bracket | 40 | 2005-07-22 |
| Answered | ACulvert | #226340 | Distribution rebar in approach slab | 39 | 2005-07-22 |
| Answered | ACulvert | #226337 | Design lane width | 77 | 2005-07-22 |
| Answered | ACulvert | #226335 | Bearing capacity check for channel box | 52 | 2005-07-22 |
| Answered | ACulvert | #226333 | About the basic data input | 48 | 2005-07-19 |
| Answered | ACulvert | #226331 | Please check | 31 | 2005-07-18 |
| Answered | ACulvert | #226329 | Lap splices in the 2nd cycle · Currently viewing | 31 | 2005-07-18 |