Skip to content
AnsweredACulvertQ&A #2262992005-07-05 18:03 · Views 52

Section where superelevation equals slope

고생이 많으십니다. 첨부 도면과 같은 단면 지원이 가능했으면 합니다. 검토후 답변 부탁 드리겠습니다.

Answer

안녕하세요. 한길아이티입니다. 당장에 적용은 힘들듯합니다. 하반기중에 업그레이드하면서 적용하도록 검토하겠습니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredACulvert#226325File attached352005-07-16
AnsweredACulvert#226323Lap splices in the 2nd cycle382005-07-16
AnsweredACulvert#226324File won't open382005-07-15
AnsweredACulvert#226321Shear rebar spacing error592005-07-14
AnsweredACulvert#226319Culvert cross-section configuration field not enabled502005-07-13
AnsweredACulvert#226317Rebar arrangement at cutoff points492005-07-13
AnsweredACulvert#226315About upgrade362005-07-13
AnsweredACulvert#226313About rebar spacing412005-07-12
AnsweredACulvert#226311Distribution rebar arrangement472005-07-12
AnsweredACulvert#226309Check at mid-height of culvert wall412005-07-11
AnsweredACulvert#226305About distribution rebar check472005-07-11
AnsweredACulvert#226306About additional loads542005-07-11
AnsweredACulvert#226303Cannot change bottom main rebar in U-type open channel422005-07-08
AnsweredACulvert#226301Modeling error292005-07-06
AnsweredACulvert#226297Question about U-type wall362005-07-05
AnsweredACulvert#226299Section where superelevation equals slope · Currently viewing522005-07-05
AnsweredACulvert#226294Please check SI-CGS units392005-07-04
AnsweredACulvert#226293Seismic analysis and corner check892005-07-04
AnsweredACulvert#226291Unclear rebar arrangement in U-type open channel502005-07-02
AnsweredACulvert#226287File with eccentric live load placement432005-06-29
Sign in to ask