AnsweredACulvertQ&A #2261702005-05-28 02:43 · Views 41

Live load

수고하십니다. 검암제#2 경우의 활하중 계산식에 대해서 P = 2 × T / 3.0 = 2 × 96.0 / 3.0 = 64.0 kN/m 을 적용하는 이유가 무엇인지요? 그리고 다른 암거의 경우 활하중이 계산서에 1KN으로 나오고 있습니다. 측벽에 작용하는 하중은 10KN에 토압계수를 적용하여 사용하는 것이 아닌지요? 검토하여주시기 바랍니다.

Answer

안녕하세요. 한길아이티입니다. 1. [개인정보] 경우의 활하중 계산식에 대해서 P = 2 × T / 3.0 = 2 × 96.0 / 3.0 = 64.0 kN/m 을 적용하는 이유가 무엇인지요? => 도로설계요령 2권 3.2.2활하중(p606)에 보시면 식이 나와 있습니다. 2.그리고 다른 암거의 경우 활하중이 계산서에 1KN으로 나오고 있습니다. 측벽에 작용하는 하중은 10KN에 토압계수를 적용하여 사용하는 것이 아닌지요? => 오류가 있었습니다.10 kN이 맞습니다.수정하여 패치에 적용하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredACulvert#268543Pile calculation report3292026-09-28
AnsweredACulvert#268536Setting section changes in culvert1742026-09-28
AnsweredACulvert#268524Design check not performed at wall center2172026-09-27
AnsweredACulvert#268523Applying moving vehicle loads2382026-09-27
AnsweredACulvert#268522Question about pile layout2612026-09-23
AnsweredACulvert#268521Question about features1302026-09-23
AnsweredACulvert#268510Question about joint check in Excel report output1852026-09-22
AnsweredACulvert#268499Error in STM analysis of corner region1442026-09-22
AnsweredACulvert#268471Launching the culvert program592026-09-18
AnsweredACulvert#268442All lines are displayed as dashed lines, what should I do?1402026-09-17
AnsweredACulvert#268429Question about U-type underpass1262026-09-17
AnsweredACulvert#268424Load position when applying railway loads to an underpass2372026-09-17
AnsweredACulvert#268417Changing girder dimensions1522026-09-17
AnsweredACulvert#268396Incorrect section check location for horizontal rebar1832026-09-16
AnsweredACulvert#268376Question about segment settings for U-type retaining wall1932026-09-15
AnsweredACulvert#268343Question about culvert drawing output1282026-09-15
AnsweredACulvert#268337Inquiry about checking retaining-wall-type wing walls3062026-09-14
AnsweredACulvert#268330About drawing output1532026-09-14
AnsweredACulvert#268318Some blocks not displayed1402026-09-14
AnsweredACulvert#268317Tank load for surcharge and moving loads3402026-09-14