Skip to content
AnsweredACulvertQ&A #2261292005-05-16 18:07 · Views 76

Inquiry about bearing capacity check

최대지반반력에 대해 전화로 문의 드렸던 사항입니다. 자료를 첨부하겠습니다. 확인부탁드립니다.

Answer

안녕하세요. 한길아이티입니다. 최대 지반반력 산출시 도로노면활하중,암거내부 활하중의 데이터가 SI 변경시 잘못 되었습니다. 허용 지지력 검토시의 지반반력 값은 옳바르게 적용되어 있습니다. 수정하여 금일 패치에 적용토록 하겠습니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredACulvert#226145Culvert general drawing692005-05-23
AnsweredACulvert#226143Typical section drawing542005-05-20
AnsweredACulvert#226141Please check an Excel output error572005-05-20
AnsweredACulvert#226139Check for missing support conditions562005-05-20
AnsweredACulvert#226137Missing support conditions592005-05-20
AnsweredACulvert#226134Changing approach slab rebar diameter682005-05-19
AnsweredACulvert#226133Inquiry about retaining wall-type wing walls612005-05-19
AnsweredACulvert#226131Calculation of a culvert with separate roadway and sidewalk642005-05-17
AnsweredACulvert#226129Inquiry about bearing capacity check · Currently viewing762005-05-16
AnsweredACulvert#226126Please check earth pressure902005-05-12
AnsweredACulvert#226125Question about SAP input data702005-05-12
AnsweredACulvert#226123Calculation report output error722005-05-11
AnsweredACulvert#226121Inquiry about live load error762005-05-11
AnsweredACulvert#226119Question about output662005-05-10
AnsweredACulvert#226117Section check for the negative moment region952005-05-09
AnsweredACulvert#226113Inquiry about retaining wall wing wall calculation report582005-05-07
AnsweredACulvert#226111Please check (shear reinforcement question)572005-05-06
AnsweredACulvert#226115Coefficient of subgrade reaction1112005-05-06
AnsweredACulvert#226109Please check532005-05-04
AnsweredACulvert#226107Concrete strength for cutoff wall lean concrete862005-05-03
Sign in to ask