Skip to content
AnsweredAAbutPierQ&A #1828242003-10-08 22:40 · Views 51

Horizontal force due to temperature load

전화로 문의 드렸던 내용입니다. pier 2를 예로, 기존 계산방법으로 최대모멘트=1000 t.m가량 나왔는데, apier의 경우 714 t.m이 나옵니다.

Answer

안녕하세요. 한길아이티입니다. 전화로 말씀드렸습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#182830Sending several issues for correction652003-10-09
AnsweredAAbutPier#182827Wing wall shear rebar432003-10-09
AnsweredAAbutPier#182824Horizontal force due to temperature load · Currently viewing512003-10-08
AnsweredAAbutPier#182820EL error at foundation bottom in abutment front view742003-10-08
AnsweredAAbutPier#182823Unit error in unit weight of flowing water in pier design environment input422003-10-08
AnsweredAAbutPier#182799Program keeps crashing after main rebar input532003-10-08
AnsweredAAbutPier#182795Crash at the step after main rebar input572003-10-08
AnsweredAAbutPier#182790Possible error in design check, please verify462003-10-07
AnsweredAAbutPier#182789Incorrect EL values in PSC beam abutment512003-10-07
AnsweredAAbutPier#182787Several things are not working692003-10-07
AnsweredAAbutPier#182782Calculation report and drawings partially inconsistent562003-10-07
AnsweredAAbutPier#182778Please review the attached file572003-10-07
AnsweredAAbutPier#182797Please check the attached file (pier driftwood impact)832003-10-07
AnsweredAAbutPier#182776Please review the attached file832003-10-07
AnsweredAAbutPier#182773Question about section check652003-10-07
AnsweredAAbutPier#182770Abutment foundation reinforcement detailing input522003-10-07
AnsweredAAbutPier#182761File error592003-10-07
AnsweredAAbutPier#182760Is there an easy way to find NG items?642003-10-06
AnsweredAAbutPier#182758Center of road is offset to one side only462003-10-06
AnsweredAAbutPier#182765About column design662003-10-06
Sign in to ask