Please review retaining wall calculation report and reinforcement drawing

수고하십니다. 1.옹벽 계산서의 "주동토압계수" 이상 2. 옹벽 배근도의 2 Cycle(배면, 상면)이 끝까지 가지 않습니다. 3. 날개벽 배근시 모든철근이 동시에 가리켜집니다. 검토 부탁합니다.

Answer

안녕하세요. 한길아이티입니다. 1. 배면각과 내부마찰각의 값에 의해 현재 이 단면은 Rankine이나 Coulomb 값에서 허수값이 생겨서 토압계수값이 산출되지 않아 생기는 에러입니다. 우선 시행쐐기법으로 전환하시면 계산이 됩니다. 이 부분에 대해서는 구조계산서 출력전에 검토를 할 수 있도록 수정하겠습니다. 2. 2Cycle 철근은 옹벽 배근입력에서 배력철근 탭을 선택하시면 2Cycle 철근의 배근 길이를 직접입력하실수 있습니다. 여기서 조정을 하시면 됩니다. 3. 현재 검토중입니다. 패치에 적용하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredACulvert#225471Retaining-wall-type wing wall error692004-11-06
AnsweredACulvert#225470Please review retaining wall calculation report and reinforcement drawing · Currently viewing492004-11-06
AnsweredACulvert#225468Results when applying unbalanced earth pressure?452004-11-05
AnsweredACulvert#225461Please check552004-11-04
AnsweredACulvert#225465Drawing file attached422004-11-04
AnsweredACulvert#225462[ACulvert] Inquiry about drawing title block612004-11-04
AnsweredACulvert#225458Box calculation and retaining wall drawing issues692004-11-03
AnsweredACulvert#225457About retaining-wall-type wing wall562004-11-03
AnsweredACulvert#225454Error when generating drawings482004-11-03
AnsweredACulvert#225453Support for SI unit conversion?542004-11-03
AnsweredACulvert#225451Retaining-wall-type wing wall492004-11-02
AnsweredACulvert#225449Main rebar input for 2-cycle at 2nd span support of double-cell culvert552004-11-02
AnsweredACulvert#225447Question about column size552004-11-02
AnsweredACulvert#225445Serviceability check692004-10-29
AnsweredACulvert#225443About wing walls592004-10-28
AnsweredACulvert#225439Diagonal reinforcement rebar check952004-10-25
AnsweredACulvert#225440About rebar at wall center642004-10-25
AnsweredACulvert#225437The slab has changed502004-10-24
AnsweredACulvert#225435Please review592004-10-23
AnsweredACulvert#225433Cannot add rebar682004-10-22
Sign in to ask