Serviceability check
해수면이 통과하는 수로암거를 설계하는데 환경조건에서 고부식성 환경으로 하였는데 균열검토 결과 정리에서는 고부식성 환경으로 나오나 상세 계산에서 습윤환경으로 계산이 되는것 같습니다 따른 검토 부탁드립니다
Answer
안녕하세요. 한길아이티입니다. 수정하였습니다. 오늘 저녁 패치를 다운받아 사용하시기 바랍니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | ACulvert | #268543 | Pile calculation report | 329 | 2026-09-28 |
| Answered | ACulvert | #268536 | Setting section changes in culvert | 174 | 2026-09-28 |
| Answered | ACulvert | #268524 | Design check not performed at wall center | 217 | 2026-09-27 |
| Answered | ACulvert | #268523 | Applying moving vehicle loads | 239 | 2026-09-27 |
| Answered | ACulvert | #268522 | Question about pile layout | 262 | 2026-09-23 |
| Answered | ACulvert | #268521 | Question about features | 130 | 2026-09-23 |
| Answered | ACulvert | #268510 | Question about joint check in Excel report output | 185 | 2026-09-22 |
| Answered | ACulvert | #268499 | Error in STM analysis of corner region | 144 | 2026-09-22 |
| Answered | ACulvert | #268471 | Launching the culvert program | 59 | 2026-09-18 |
| Answered | ACulvert | #268442 | All lines are displayed as dashed lines, what should I do? | 140 | 2026-09-17 |
| Answered | ACulvert | #268429 | Question about U-type underpass | 126 | 2026-09-17 |
| Answered | ACulvert | #268424 | Load position when applying railway loads to an underpass | 237 | 2026-09-17 |
| Answered | ACulvert | #268417 | Changing girder dimensions | 152 | 2026-09-17 |
| Answered | ACulvert | #268396 | Incorrect section check location for horizontal rebar | 184 | 2026-09-16 |
| Answered | ACulvert | #268376 | Question about segment settings for U-type retaining wall | 194 | 2026-09-15 |
| Answered | ACulvert | #268343 | Question about culvert drawing output | 129 | 2026-09-15 |
| Answered | ACulvert | #268337 | Inquiry about checking retaining-wall-type wing walls | 306 | 2026-09-14 |
| Answered | ACulvert | #268330 | About drawing output | 154 | 2026-09-14 |
| Answered | ACulvert | #268318 | Some blocks not displayed | 141 | 2026-09-14 |
| Answered | ACulvert | #268317 | Tank load for surcharge and moving loads | 342 | 2026-09-14 |