AnsweredAAbutPierQ&A #1827732003-10-07 05:59 · Views 65

Question about section check

단면검토에서 As req값이 As min보다 작을 경우는 (4/3)As req와 As min을 비교하여 작은 값 이상을 사용하는 것으로 알고 있습니다. 그런데 제가 입력을 잘 못 해서인지는 모르겠으나 첨부된 화일을 보시면 교대에서 1) Pmin값이 무조건 14/fy값으로 되어있으며 2) Pmin값이 Puse보다 커도 OK입니다. 확인하여 연락해주시면 감사하겠습니다. [개인정보] [개인정보] [개인정보]

Answer

안녕하세요. 한길아이티입니다. 최소철근비는 14/fy과 0.80 √fck/fy 중 큰 값이 적용되고 있습니다. 그리고 철근비가 최소철근비보다 작더라고 필요철근량의 4/3이상 배치가 된 경우에는 철근비를 만족하도록 되어 있습니다. 아래의 검토예를 참고하시기 바랍니다. (마산시점 교대1, 흉벽) 검토예) Pmin : 14 / fy = 0.00467 0.80 √fck / fy = 0.00413 , Pmin = 0.00467 적용 Pmax = 0.75 x Pb = 0.75 x k1 x Φx (fck / fy) x {6000 / (6000 + fy)} = 0.02890 Puse = As / bd = 0.00318 Pmax ≥ Puse, Pmin>Puse,As ≥ As(req) x 4/3 → 철근비 만족, ∴ O.K (콘.설 6.3.2) 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#182830Sending several issues for correction652003-10-09
AnsweredAAbutPier#182827Wing wall shear rebar432003-10-09
AnsweredAAbutPier#182824Horizontal force due to temperature load512003-10-08
AnsweredAAbutPier#182820EL error at foundation bottom in abutment front view742003-10-08
AnsweredAAbutPier#182823Unit error in unit weight of flowing water in pier design environment input422003-10-08
AnsweredAAbutPier#182799Program keeps crashing after main rebar input532003-10-08
AnsweredAAbutPier#182795Crash at the step after main rebar input572003-10-08
AnsweredAAbutPier#182790Possible error in design check, please verify462003-10-07
AnsweredAAbutPier#182789Incorrect EL values in PSC beam abutment512003-10-07
AnsweredAAbutPier#182787Several things are not working692003-10-07
AnsweredAAbutPier#182782Calculation report and drawings partially inconsistent562003-10-07
AnsweredAAbutPier#182778Please review the attached file572003-10-07
AnsweredAAbutPier#182797Please check the attached file (pier driftwood impact)832003-10-07
AnsweredAAbutPier#182776Please review the attached file832003-10-07
AnsweredAAbutPier#182773Question about section check · Currently viewing652003-10-07
AnsweredAAbutPier#182770Abutment foundation reinforcement detailing input522003-10-07
AnsweredAAbutPier#182761File error592003-10-07
AnsweredAAbutPier#182760Is there an easy way to find NG items?642003-10-06
AnsweredAAbutPier#182758Center of road is offset to one side only462003-10-06
AnsweredAAbutPier#182765About column design662003-10-06
Sign in to ask