Question about approach slab
안녕하십니까? 첨부한 파일에서 날개벽 각도에 따라 접속 슬래브도 각도를 적용하는 옵션을 선택하여 작업을 했습니다. 그런데, 배근도가 잘 나오지 않습니다. 확인 부탁드립니다. 그럼, 좋은 하루 되십시요.
Answer
안녕하세요. 한길아이티입니다. 전화로 말씀드렸습니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #182481 | Input data | 105 | 2003-09-22 |
| Answered | AAbutPier | #182461 | Rebar reinforcement detailing looks wrong | 90 | 2003-09-19 |
| Answered | AAbutPier | #182458 | Front view EL input is wrong | 70 | 2003-09-19 |
| Answered | AAbutPier | #182456 | About bearing seat reinforcement detailing | 59 | 2003-09-19 |
| Answered | AAbutPier | #182455 | Wing wall section reinforcement drawing and rebar details are wrong | 72 | 2003-09-19 |
| Answered | AAbutPier | #182454 | Quantity report and structural calculation report | 86 | 2003-09-19 |
| Answered | AAbutPier | #182449 | Follow-up to my phone inquiry | 51 | 2003-09-19 |
| Answered | AAbutPier | #182446 | Question about approach slab · Currently viewing | 47 | 2003-09-18 |
| Answered | AAbutPier | #182444 | About geological borehole logs | 49 | 2003-09-18 |
| Answered | AAbutPier | #182448 | In the pier general drawing | 51 | 2003-09-18 |
| Answered | AAbutPier | #182416 | About rebar data input for the abutment | 45 | 2003-09-17 |
| Answered | AAbutPier | #182410 | Question on abutment section drawing input | 50 | 2003-09-17 |
| Answered | AAbutPier | #182407 | About bearing area layout | 55 | 2003-09-17 |
| Answered | AAbutPier | #182431 | Shoe direction looks wrong | 58 | 2003-09-17 |
| Answered | AAbutPier | #182422 | Compression rebar CTC 125 not applied to abutment heel | 37 | 2003-09-17 |
| Answered | AAbutPier | #182384 | Only supports 1 and 2 appear in "Design abutment input" for a 2-span bridge | 75 | 2003-09-16 |
| Answered | AAbutPier | #182393 | Error applying abutment main rebar to drawings | 46 | 2003-09-16 |
| Answered | AAbutPier | #182387 | Mass concrete in piers | 47 | 2003-09-16 |
| Answered | AAbutPier | #182381 | Rebar quantity for double-layer bearing area reinforcement not shown | 85 | 2003-09-16 |
| Answered | AAbutPier | #182383 | Output for skewed bridges | 71 | 2003-09-15 |