Cross slope is not applied
수고하십니다. apier사용시 aline 에서 설정한 편구배가 적용되지 (교량중심기준으로) 않아서 질문드립니다.([개인정보])
Answer
안녕하세요. 한길아이티입니다. ALine에서 좌측편구배 및 우측편구배를 -2.00%로 입력하셔야 됩니다. 현재 좌측 -2.00% 우측 +2.00%로 입력이 되어있습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #181931 | Bearing point EL. does not account for longitudinal slope | 35 | 2003-08-07 |
| Answered | AAbutPier | #181930 | Superstructure reactions change | 57 | 2003-08-07 |
| Answered | AAbutPier | #181921 | While outputting the pier calculation report file | 62 | 2003-08-06 |
| Answered | AAbutPier | #181917 | Program crashes in bearing data input | 49 | 2003-08-06 |
| Answered | AAbutPier | #181881 | EL, longitudinal slope, arbitrary drawing angle, hook rebar details, etc. | 124 | 2003-08-05 |
| Answered | AAbutPier | #181891 | How do I rotate the bearing block? | 86 | 2003-08-05 |
| Answered | AAbutPier | #181879 | Program crashes | 71 | 2003-08-05 |
| Answered | AAbutPier | #181874 | Question | 86 | 2003-08-05 |
| Answered | AAbutPier | #181872 | Abutment and pier reinforcement detailing, details and material table issues | 87 | 2003-08-05 |
| Answered | AAbutPier | #181863 | Dimension lines are not displayed | 51 | 2003-08-04 |
| Answered | AAbutPier | #181869 | A few questions | 115 | 2003-08-04 |
| Answered | AAbutPier | #181854 | Program crashes during modeling | 46 | 2003-08-03 |
| Answered | AAbutPier | #181846 | Program crashes after entering abutment main rebar | 61 | 2003-08-02 |
| Answered | AAbutPier | #181845 | L value shown in rebar detail drawing looks wrong | 43 | 2003-08-02 |
| Answered | AAbutPier | #181841 | Please check | 55 | 2003-08-02 |
| Answered | AAbutPier | #181831 | Cross slope is not applied · Currently viewing | 52 | 2003-08-01 |
| Answered | AAbutPier | #181840 | About distribution rebar in abutment stem wall | 56 | 2003-08-01 |
| Answered | AAbutPier | #181830 | Square treatment of foundation plan | 123 | 2003-08-01 |
| Answered | AAbutPier | #181823 | Error in quantity calculation report output | 56 | 2003-08-01 |
| Answered | AAbutPier | #181822 | Shoe block connection at pier | 71 | 2003-07-31 |