Girder layout error

상하행 분리 교량 입니다. 마산방향 : 4@30+2@30+25=205 김해방향 : 4@30+2@30+19=199 거더 길이를 제대로 INPUT 하였는데도 불구하고 거더배치에서 제대로 실행이 되지 않고 있습니다. 일반도를 같이 보내오니 검토 바랍니다.

Answer

안녕하세요. 한길아이티입니다. 전화로 답변드렸습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#207912Error applying under-girder clearance height at bearing seat252007-11-05
AnsweredAAbutPier#207927Bridge bearing rotation302007-11-05
AnsweredAAbutPier#207926Corrections needed for abutment, pier and seismic analysis642007-11-05
AnsweredAAbutPier#207920Existing file302007-11-05
AnsweredAAbutPier#207916import402007-11-05
AnsweredAAbutPier#207907Error during seismic analysis472007-11-04
AnsweredAAbutPier#207892Changing abutment width412007-11-03
AnsweredAAbutPier#207891Seismic analysis modeling error322007-11-03
AnsweredAAbutPier#207904Bearing error682007-11-02
AnsweredAAbutPier#207903Pile depth error112007-11-02
AnsweredAAbutPier#207897Girder layout error · Currently viewing422007-11-02
AnsweredAAbutPier#207889Question on confinement rebar for hollow piers392007-11-02
AnsweredAAbutPier#207888About single cast-in-place piles562007-11-02
AnsweredAAbutPier#207887Follow-up question on cross sections402007-11-02
AnsweredAAbutPier#207881Bridge bearing quantity?342007-11-02
AnsweredAAbutPier#207879Question on cross-section configuration552007-11-02
AnsweredAAbutPier#207877Seismic check452007-11-02
AnsweredAAbutPier#207872Bridge bearing shape and height error632007-11-02
AnsweredAAbutPier#207869Structural calculation report output742007-11-02
AnsweredAAbutPier#207873Pile foundation check verification512007-11-01
Sign in to ask