Urgent check request
1. 두부보배근에서 철근하단부 교축직각방향(가장하단) 철근이 간격입력했음에도 표현이 되지 않습니다. 검토부탁드립니다. 두부봽근에서 전단철근치수삽입 화면창에서 보시면 알수있습니다 2방향 동일합니다. 오늘중으로 해야하는 일이므로 검토좀 빨리 부탁드리겠습니다.
Answer
안녕하세요. 한길아이티입니다. 입력하신 부분을 살펴보니, 교각입력-단면도 제원에서 HL1, HL2부분을 입력하셨습니다. 올려주신 형식에서는 HL1, HL2 부분을 O(ZERO)로 입력하시고 CL1=2550으로 입력하시면 두부보에서 정상적으로 철근이 배근됩니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #207793 | Ground N-value mismatch | 48 | 2007-10-30 |
| Answered | AAbutPier | #207785 | Another question | 27 | 2007-10-29 |
| Answered | AAbutPier | #207783 | File won't open, please check | 15 | 2007-10-29 |
| Answered | AAbutPier | #207777 | Wing wall rebar looks wrong | 14 | 2007-10-29 |
| Answered | AAbutPier | #207775 | Question | 16 | 2007-10-29 |
| Answered | AAbutPier | #207774 | Quantity issue in pile check | 32 | 2007-10-29 |
| Answered | AAbutPier | #207772 | Stream pressure load | 50 | 2007-10-29 |
| Answered | AAbutPier | #207765 | Approach slab shear rebar detail application and display error | 28 | 2007-10-28 |
| Answered | AAbutPier | #207763 | Wing wall rebar stretched after shear rebar detail patch | 12 | 2007-10-28 |
| Answered | AAbutPier | #207761 | Shoe position error on bearing seat | 33 | 2007-10-27 |
| Answered | AAbutPier | #207750 | Inquiry about reinforcement under bridge bearings | 25 | 2007-10-27 |
| Answered | AAbutPier | #207742 | Determining wing wall shear rebar shape | 28 | 2007-10-27 |
| Answered | AAbutPier | #207738 | Add bar count to wing wall shear rebar calculation | 30 | 2007-10-27 |
| Answered | AAbutPier | #207722 | Load diagram differs from pier frame analysis | 23 | 2007-10-27 |
| Answered | AAbutPier | #207721 | *** text corruption and misaligned text in rebar material table | 35 | 2007-10-27 |
| Answered | AAbutPier | #207714 | Urgent check request · Currently viewing | 36 | 2007-10-26 |
| Answered | AAbutPier | #207735 | Error when printing calculation report | 27 | 2007-10-26 |
| Answered | AAbutPier | #207729 | Errors in the quantity calculation report | 61 | 2007-10-26 |
| Answered | AAbutPier | #207728 | Abutment cross slope drawing error | 28 | 2007-10-26 |
| Answered | AAbutPier | #207720 | Follow-up question on post 31200 | 45 | 2007-10-26 |