Error in balanced reinforcement ratio formula
균형 철근비 계산식에서 KN단위일 때 600이 나와야 하고 Kg단위일 때 6000이 나와야하는데 KN 단위일 때 60, Kg단위일 때 600이 나와서 철근비 계산에 오류가 나서 뒷부분 철근량 계산에 에러가 납니다. 수정해서 올려주세요. -[개인정보]-
Answer
안녕하세요. 한길아이티입니다. 일반입력-기초자료의 철근의 탄성계수값을 잘못 입력하셨습니다. 20000MPa으로 입력하셨습니다. 200000MPa로 입력시 제대로 산출됩니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #207713 | Please check | 39 | 2007-10-26 |
| Answered | AAbutPier | #207710 | Pier bearing seat reinforcement detailing | 44 | 2007-10-26 |
| Answered | AAbutPier | #207703 | Drawing representation for varying mass concrete length? | 68 | 2007-10-26 |
| Answered | AAbutPier | #207701 | Internal error | 59 | 2007-10-26 |
| Answered | AAbutPier | #207699 | Error when generating calculation report | 9 | 2007-10-26 |
| Answered | AAbutPier | #207692 | Pier bearing seat reinforcement detailing | 32 | 2007-10-26 |
| Answered | AAbutPier | #207690 | Edge distance check does not work | 30 | 2007-10-26 |
| Answered | AAbutPier | #207707 | Abutment shear rebar check, pier foundation reinforcement design check, frame analysis | 39 | 2007-10-26 |
| Answered | AAbutPier | #207700 | *** *** | 9 | 2007-10-26 |
| Answered | AAbutPier | #207698 | Separation distance between up and down lines | 16 | 2007-10-26 |
| Answered | AAbutPier | #207688 | Error in balanced reinforcement ratio formula · Currently viewing | 23 | 2007-10-26 |
| Answered | AAbutPier | #207687 | Seismic modeling error when adding a bridge | 34 | 2007-10-26 |
| Answered | AAbutPier | #207686 | Does this change with the upgrade? | 45 | 2007-10-26 |
| Answered | AAbutPier | #207684 | Internal error | 26 | 2007-10-26 |
| Answered | AAbutPier | #207667 | Horizontal force values look wrong after frame analysis | 55 | 2007-10-25 |
| Answered | AAbutPier | #207682 | Question on applying section forces | 54 | 2007-10-25 |
| Answered | AAbutPier | #207676 | Rounded pier coping? | 40 | 2007-10-25 |
| Answered | AAbutPier | #207674 | Seismic check | 28 | 2007-10-25 |
| Answered | AAbutPier | #207673 | ARoad *.sbi compatibility and quantity summary error | 84 | 2007-10-25 |
| Answered | AAbutPier | #207663 | Calculation report also attached | 32 | 2007-10-25 |