Skip to content
AnsweredAAbutPierQ&A #2073112007-10-17 18:45 · Views 13

Please review

자꾸 귀찮게 해드려서 죄송합니다. 1.내진에서 교각은 안착한거 같은데 계산결과보기를 보니 교축방향의 내진해석값은 표현이 안되는데 확인부탁드립니다. 2. 현장타설말뚝의 배치가 업데이트전에는 A1의 경우 8본이 들어갔는데 업데이트후 다시 돌려보니 4개가 들어가더라구요~확인좀 부탁드립니다.

Answer

안녕하세요. 한길아이티입니다. 첨부한 파일 참조하시면 됩니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#207311Please review · Currently viewing132007-10-17
AnsweredAAbutPier#207312Reposting the rebar issue202007-10-17
AnsweredAAbutPier#207310Reactions look wrong282007-10-17
AnsweredAAbutPier#207303Total bridge length252007-10-17
AnsweredAAbutPier#207293Bearing block222007-10-17
AnsweredAAbutPier#207289Question about horizontal seismic force results302007-10-17
AnsweredAAbutPier#207286Can't set up the span configuration262007-10-17
AnsweredAAbutPier#207281Bearing seat dimension design check doesn't work452007-10-17
AnsweredAAbutPier#207278Placing cross beams in seismic analysis282007-10-17
AnsweredAAbutPier#207301Calculating the section modulus of ST.PLATE262007-10-16
AnsweredAAbutPier#207265Please review202007-10-16
AnsweredAAbutPier#207297About widened bridges382007-10-16
AnsweredAAbutPier#207260Internal error192007-10-16
AnsweredAAbutPier#207259Distribution and shear rebar reinforcement detailing142007-10-16
AnsweredAAbutPier#207254Entering the distance from the fixed end352007-10-16
AnsweredAAbutPier#207282Water hammer252007-10-16
AnsweredAAbutPier#207276Number of bearing seat steps when the start is a pier, not an abutment172007-10-16
AnsweredAAbutPier#207261Compatibility issue with the 2003 version332007-10-16
AnsweredAAbutPier#207256Reinforcement detailing issue still not resolved222007-10-16
AnsweredAAbutPier#207252Is this pier section supported?252007-10-16
Sign in to ask