Rebar quantity below bridge bearing differs between program and Excel sheet
보내드리는 파일을 보시면 교량받침하면 철근량 산정시 필요철근량이 프로그램상 교축직각방향 : 3764.092 출력된 엑셀시트상 : 7740.665 이렇게 차이가 납니다 왜그런지 알려주세효
Answer
안녕하세요. 한길아이티입니다. 다음화면을 참고하시기 바랍니다. (그림 생략) 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #207106 | When entering shear and distribution rebar | 20 | 2007-10-12 |
| Answered | AAbutPier | #207102 | Bearing seat detail "A" not output | 19 | 2007-10-12 |
| Answered | AAbutPier | #207101 | Plastic design - confinement rebar quantity check error | 27 | 2007-10-12 |
| Answered | AAbutPier | #207091 | Abnormal Vu value after applying patch | 17 | 2007-10-11 |
| Answered | AAbutPier | #207088 | Abutment bearing seat elevation wrong again | 28 | 2007-10-11 |
| Answered | AAbutPier | #207078 | Coping step location | 20 | 2007-10-11 |
| Answered | AAbutPier | #207074 | Column check error | 41 | 2007-10-11 |
| Answered | AAbutPier | #207069 | Vu value is "0" in corbel (deep beam) check | 30 | 2007-10-11 |
| Answered | AAbutPier | #207107 | Bearing spring constant issue in seismic analysis | 15 | 2007-10-11 |
| Answered | AAbutPier | #207096 | Rebar quantity below bridge bearing differs between program and Excel sheet · Currently viewing | 18 | 2007-10-11 |
| Answered | AAbutPier | #207092 | Discrepancy in seismic horizontal force between start and end abutments | 40 | 2007-10-11 |
| Answered | AAbutPier | #207070 | Shear and distribution rebar error | 59 | 2007-10-11 |
| Answered | AAbutPier | #207048 | Seismic error | 32 | 2007-10-11 |
| Answered | AAbutPier | #207045 | Girder layout program error | 34 | 2007-10-11 |
| Answered | AAbutPier | #207036 | APR file for post 30485 | 21 | 2007-10-11 |
| Answered | AAbutPier | #207030 | Skewed abutment design | 61 | 2007-10-10 |
| Answered | AAbutPier | #207021 | Designing a bridge modified from an existing bridge | 16 | 2007-10-10 |
| Answered | AAbutPier | #207018 | Seismic analysis modeling error | 18 | 2007-10-10 |
| Answered | AAbutPier | #207037 | Abutment calculation report inquiry | 22 | 2007-10-10 |
| Answered | AAbutPier | #207020 | Wing wall reinforcement drawing and rebar schedule do not match | 27 | 2007-10-10 |