Skip to content
AnsweredAAbutPierQ&A #2070162007-10-10 10:55 · Views 19

Abutment calculation report inquiry

교대계산서 철근량 산정의 모멘트값과 프로그램상 설계검토의 값이 불일치

Answer

안녕하세요. 한길아이티입니다. 올려주신 파일을 검토해 보았으나 Mu값이 상이한것을 발견하지 못하였습니다. 계산서와 삽도에 올려주신 캡쳐는 A2교대이며, 계산서는 A1인것으로 판단되어집니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#207016Abutment calculation report inquiry · Currently viewing192007-10-10
AnsweredAAbutPier#207012When checking the pier cap422007-10-10
AnsweredAAbutPier#207006Has the fix from answer 30353 been patched?122007-10-10
AnsweredAAbutPier#207000Shoe positions changed during seismic analysis242007-10-10
AnsweredAAbutPier#206994Please review242007-10-10
AnsweredAAbutPier#206987Reference height for underbridge clearance at bearing seat322007-10-10
AnsweredAAbutPier#206968Data compatibility issue when using APIER2003 data332007-10-09
AnsweredAAbutPier#206963Illustration error312007-10-09
AnsweredAAbutPier#206959Wall rebar detailing issue (urgent)202007-10-09
AnsweredAAbutPier#206957P2 calculation report output162007-10-09
AnsweredAAbutPier#207004Pier calculation report inquiry242007-10-09
AnsweredAAbutPier#206952Patch confirmation?362007-10-09
AnsweredAAbutPier#206986Pier shape192007-10-09
AnsweredAAbutPier#206982Reposting: distribution rebar quantity362007-10-09
AnsweredAAbutPier#206980Question about seismic horizontal force192007-10-09
AnsweredAAbutPier#206978Awaiting a reply142007-10-09
AnsweredAAbutPier#206974Illustration error - reposting162007-10-09
AnsweredAAbutPier#206956When checking the pier cap232007-10-09
AnsweredAAbutPier#206953Coordinates are incorrect (urgent)132007-10-09
AnsweredAAbutPier#206950Parapet rebar drawing error too182007-10-09
Sign in to ask