Skip to content
AnsweredAAbutPierQ&A #2068042007-10-04 16:04 · Views 25

Please check

확인 부탁드립니다..

Answer

안녕하세요. 한길아이티입니다. 답변이 늦어 죄송합니다. 기초직각 처리후 날개벽 오류는 수정하여 금일중으로 패치하겠습니다. 교좌면 제원 오류는 수정하여 내일중으로 패치하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#206858Bearing seat level in cross slope262007-10-05
AnsweredAAbutPier#206857Pier shape212007-10-05
AnsweredAAbutPier#206853Column tie bars192007-10-05
AnsweredAAbutPier#206851Problem applying a single cast-in-place pile in pier design272007-10-05
AnsweredAAbutPier#206848Seismic analysis frame analysis error272007-10-05
AnsweredAAbutPier#206865Calculating horizontal force for a single-span bridge312007-10-05
AnsweredAAbutPier#206855Pier foundation reinforcement detailing272007-10-05
AnsweredAAbutPier#206854Seismic results not output262007-10-05
AnsweredAAbutPier#206847Error designing a bridge with two superstructure types152007-10-05
AnsweredAAbutPier#206846Incorrect EL. at widened section292007-10-05
AnsweredAAbutPier#206828Distance between parapet wall and bearing182007-10-05
AnsweredAAbutPier#206812Wing wall plate analysis error402007-10-05
AnsweredAAbutPier#206806Pier design with a single cast-in-place pile272007-10-05
AnsweredAAbutPier#206791Cannot move to the next step252007-10-04
AnsweredAAbutPier#206829Please check pile reactions442007-10-04
AnsweredAAbutPier#206786Can't I see pile results without entering ground data?162007-10-04
AnsweredAAbutPier#206826Calculation error for abutment pile group centroid312007-10-04
AnsweredAAbutPier#206818Is post 30280 the answer to post 30269? The answer doesn't match the question172007-10-04
AnsweredAAbutPier#206809Please check question no. ***152007-10-04
AnsweredAAbutPier#206804Please check · Currently viewing252007-10-04
Sign in to ask