Horizontal force during earthquake
지진시 수평력이 너무 크게 나옵니다. 상부aroad화일 받아서 진행했는데 어디가 문제인지 알수 없어서 문의 드립니다.
Answer
안녕하세요. 한길아이티입니다. 해석결과에 대한 판단은 사용자가 하셔야 하는것으로 보이며 이부분은 교량계획과도 관련되는 부분이므로 제가 해드릴수 있는것은 아닌것으로 판단됩니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #206273 | Horizontal force during earthquake · Currently viewing | 24 | 2007-09-13 |
| Answered | AAbutPier | #206268 | Question about IPC girders | 47 | 2007-09-13 |
| Answered | AAbutPier | #206267 | Question about foundation | 36 | 2007-09-13 |
| Answered | AAbutPier | #206266 | File won't open | 49 | 2007-09-13 |
| Answered | AAbutPier | #206259 | Uploading superstructure file | 38 | 2007-09-13 |
| Answered | AAbutPier | #206258 | Question about pier bearing seat | 42 | 2007-09-13 |
| Answered | AAbutPier | #206261 | Internal program error | 35 | 2007-09-12 |
| Answered | AAbutPier | #206260 | Please check wing wall calculation | 47 | 2007-09-12 |
| Answered | AAbutPier | #206256 | Uploading file | 45 | 2007-09-12 |
| Answered | AAbutPier | #206253 | Question about pile design | 47 | 2007-09-12 |
| Answered | AAbutPier | #206249 | Question about FL | 21 | 2007-09-12 |
| Answered | AAbutPier | #206229 | About seismic design... | 12 | 2007-09-12 |
| Answered | AAbutPier | #206227 | *** Applying central drainage section for separated up/down lines | 15 | 2007-09-11 |
| Answered | AAbutPier | #206242 | Question about superelevation | 24 | 2007-09-11 |
| Answered | AAbutPier | #206238 | Question about version 2007 | 45 | 2007-09-11 |
| Answered | AAbutPier | #206223 | Patch request: section cut lines in generated drawings!!! | 33 | 2007-09-11 |
| Answered | AAbutPier | #206221 | Seismic design when start and end points are piers | 10 | 2007-09-11 |
| Answered | AAbutPier | #206211 | Beam layout for curved bridge | 28 | 2007-09-10 |
| Answered | AAbutPier | #206204 | Check of variable-section wing wall | 18 | 2007-09-10 |
| Answered | AAbutPier | #206191 | Question on quantities for abutment inspection facilities | 32 | 2007-09-10 |