Skip to content
AnsweredAAbutPierQ&A #2062422007-09-11 20:39 · Views 24

Question about superelevation

현재 선형중심선이 교량 중심선과 일치하지 않습니다. 교량중심에서 좌우측으로 편경사를 -2%로 주고 싶으면... 어떻게 해야하나요??

Answer

안녕하세요. 한길아이티입니다. 화일을 같이 첨부해주셔야지 검토가 가능합니다. 편경사는 선형에서 주게끔 되어 있읍니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#206273Horizontal force during earthquake242007-09-13
AnsweredAAbutPier#206268Question about IPC girders472007-09-13
AnsweredAAbutPier#206267Question about foundation362007-09-13
AnsweredAAbutPier#206266File won't open492007-09-13
AnsweredAAbutPier#206259Uploading superstructure file382007-09-13
AnsweredAAbutPier#206258Question about pier bearing seat422007-09-13
AnsweredAAbutPier#206261Internal program error352007-09-12
AnsweredAAbutPier#206260Please check wing wall calculation472007-09-12
AnsweredAAbutPier#206256Uploading file452007-09-12
AnsweredAAbutPier#206253Question about pile design472007-09-12
AnsweredAAbutPier#206249Question about FL212007-09-12
AnsweredAAbutPier#206229About seismic design...122007-09-12
AnsweredAAbutPier#206227*** Applying central drainage section for separated up/down lines152007-09-11
AnsweredAAbutPier#206242Question about superelevation · Currently viewing242007-09-11
AnsweredAAbutPier#206238Question about version 2007452007-09-11
AnsweredAAbutPier#206223Patch request: section cut lines in generated drawings!!!332007-09-11
AnsweredAAbutPier#206221Seismic design when start and end points are piers102007-09-11
AnsweredAAbutPier#206211Beam layout for curved bridge282007-09-10
AnsweredAAbutPier#206204Check of variable-section wing wall182007-09-10
AnsweredAAbutPier#206191Question on quantities for abutment inspection facilities322007-09-10
Sign in to ask