Skip to content
AnsweredAAbutPierQ&A #2061122007-09-06 02:12 · Views 31

Request to check pier cap dimensions and column tie bar layout

1. 두부보제원에서 받침이 교각의 center에서 벗어나 그려짐. 2. 기둥부띠철근이 교각상단면을 벗어나 그려짐.

Answer

안녕하세요. 한길아이티입니다. 사용자께서 스스로 해결하셨다니 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#206112Request to check pier cap dimensions and column tie bar layout · Currently viewing312007-09-06
AnsweredAAbutPier#206111Widening at pier center in R bridge312007-09-06
AnsweredAAbutPier#206109Superelevation calculation program error112007-09-06
AnsweredAAbutPier#206113Post 29526 resolved522007-09-05
AnsweredAAbutPier#206110Not recognized312007-09-05
AnsweredAAbutPier#206107Question about seismic design402007-09-05
AnsweredAAbutPier#206102Why the foundation analysis does not run352007-09-05
AnsweredAAbutPier#206100Why the seismic analysis does not run?242007-09-05
AnsweredAAbutPier#206096Reinforcement not entered when using two layers of main rebar in abutment footing heel242007-09-05
AnsweredAAbutPier#206095Why the seismic analysis does not run?252007-09-05
AnsweredAAbutPier#206091Attaching the file below192007-09-04
AnsweredAAbutPier#206080About bearings392007-09-04
AnsweredAAbutPier#206068Shouldn't the larger value be applied for superstructure inertia (horizontal) force?742007-09-04
AnsweredAAbutPier#206063Inquiry about pier end beam dimensions (bearing locations)142007-09-03
AnsweredAAbutPier#206060Bridge bearing horizontal force is too large402007-09-03
AnsweredAAbutPier#206078Manual input262007-09-03
AnsweredAAbutPier#206075N-value at pile head232007-09-03
AnsweredAAbutPier#206054Error when creating sapdata for seismic analysis392007-09-03
AnsweredAAbutPier#206073New employee of 4 months482007-09-03
AnsweredAAbutPier#206059Quantity calculation report342007-09-03
Sign in to ask