Question about seismic design
안녕하세요 [한길 담당자]. 전화로 말씀드렸던 내진에 관한 질문입니다. ABeamDeck와 APier 둘다 압축하여 올렸습니다.
Answer
안녕하세요. 한길아이티입니다. ABeamDeck에서 APier로 전달시 반력에 문제가 있기때문에 단면에 대한 단위중량이 잘못들어가고 있었읍니다. 수정하여 오늘까지 업데이트 하도록 하겠읍니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #206112 | Request to check pier cap dimensions and column tie bar layout | 31 | 2007-09-06 |
| Answered | AAbutPier | #206111 | Widening at pier center in R bridge | 31 | 2007-09-06 |
| Answered | AAbutPier | #206109 | Superelevation calculation program error | 11 | 2007-09-06 |
| Answered | AAbutPier | #206113 | Post 29526 resolved | 52 | 2007-09-05 |
| Answered | AAbutPier | #206110 | Not recognized | 31 | 2007-09-05 |
| Answered | AAbutPier | #206107 | Question about seismic design · Currently viewing | 40 | 2007-09-05 |
| Answered | AAbutPier | #206102 | Why the foundation analysis does not run | 35 | 2007-09-05 |
| Answered | AAbutPier | #206100 | Why the seismic analysis does not run? | 24 | 2007-09-05 |
| Answered | AAbutPier | #206096 | Reinforcement not entered when using two layers of main rebar in abutment footing heel | 24 | 2007-09-05 |
| Answered | AAbutPier | #206095 | Why the seismic analysis does not run? | 25 | 2007-09-05 |
| Answered | AAbutPier | #206091 | Attaching the file below | 19 | 2007-09-04 |
| Answered | AAbutPier | #206080 | About bearings | 39 | 2007-09-04 |
| Answered | AAbutPier | #206068 | Shouldn't the larger value be applied for superstructure inertia (horizontal) force? | 74 | 2007-09-04 |
| Answered | AAbutPier | #206063 | Inquiry about pier end beam dimensions (bearing locations) | 14 | 2007-09-03 |
| Answered | AAbutPier | #206060 | Bridge bearing horizontal force is too large | 40 | 2007-09-03 |
| Answered | AAbutPier | #206078 | Manual input | 26 | 2007-09-03 |
| Answered | AAbutPier | #206075 | N-value at pile head | 23 | 2007-09-03 |
| Answered | AAbutPier | #206054 | Error when creating sapdata for seismic analysis | 39 | 2007-09-03 |
| Answered | AAbutPier | #206073 | New employee of 4 months | 48 | 2007-09-03 |
| Answered | AAbutPier | #206059 | Quantity calculation report | 34 | 2007-09-03 |