Reinforcement not entered when using two layers of main rebar in abutment footing heel
수고 하십니다. 교대기초 뒷굽 2단주철근시 배근철근 미입력 됩니다 . 검토 부탁합니다.
Answer
안녕하세요. 한길아이티입니다. 교대전단및 배력철근입력에서 기초뒷굽 인장면 2단철근에 대해서 입력이 누락되었읍니다. 화일을 올려드리니 참고하시기 바랍니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #206112 | Request to check pier cap dimensions and column tie bar layout | 31 | 2007-09-06 |
| Answered | AAbutPier | #206111 | Widening at pier center in R bridge | 31 | 2007-09-06 |
| Answered | AAbutPier | #206109 | Superelevation calculation program error | 11 | 2007-09-06 |
| Answered | AAbutPier | #206113 | Post 29526 resolved | 52 | 2007-09-05 |
| Answered | AAbutPier | #206110 | Not recognized | 31 | 2007-09-05 |
| Answered | AAbutPier | #206107 | Question about seismic design | 40 | 2007-09-05 |
| Answered | AAbutPier | #206102 | Why the foundation analysis does not run | 35 | 2007-09-05 |
| Answered | AAbutPier | #206100 | Why the seismic analysis does not run? | 24 | 2007-09-05 |
| Answered | AAbutPier | #206096 | Reinforcement not entered when using two layers of main rebar in abutment footing heel · Currently viewing | 24 | 2007-09-05 |
| Answered | AAbutPier | #206095 | Why the seismic analysis does not run? | 25 | 2007-09-05 |
| Answered | AAbutPier | #206091 | Attaching the file below | 19 | 2007-09-04 |
| Answered | AAbutPier | #206080 | About bearings | 39 | 2007-09-04 |
| Answered | AAbutPier | #206068 | Shouldn't the larger value be applied for superstructure inertia (horizontal) force? | 74 | 2007-09-04 |
| Answered | AAbutPier | #206063 | Inquiry about pier end beam dimensions (bearing locations) | 14 | 2007-09-03 |
| Answered | AAbutPier | #206060 | Bridge bearing horizontal force is too large | 40 | 2007-09-03 |
| Answered | AAbutPier | #206078 | Manual input | 26 | 2007-09-03 |
| Answered | AAbutPier | #206075 | N-value at pile head | 23 | 2007-09-03 |
| Answered | AAbutPier | #206054 | Error when creating sapdata for seismic analysis | 39 | 2007-09-03 |
| Answered | AAbutPier | #206073 | New employee of 4 months | 48 | 2007-09-03 |
| Answered | AAbutPier | #206059 | Quantity calculation report | 34 | 2007-09-03 |