AnsweredAAbutPierQ&A #2060952007-09-05 00:49 · Views 25

Why the seismic analysis does not run?

국지도 49호선방향이 실행이 안되오니 검토부탁드립니다.

Answer

안녕하세요. 한길아이티입니다. 프로젝트설정입력에서 선형반대방향 이름을 "국지도 49호선"->"국지도49호선"으로 변경하시기 바랍니다. 내진 input화일생성시 화일명+선형방향,선형반대방향이름을 가지고 생성되므로 이때도 마찬가지로 특수문자나 빈공간이 있으면 sap에서 인식이 되지 않고 있읍니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#206112Request to check pier cap dimensions and column tie bar layout312007-09-06
AnsweredAAbutPier#206111Widening at pier center in R bridge312007-09-06
AnsweredAAbutPier#206109Superelevation calculation program error112007-09-06
AnsweredAAbutPier#206113Post 29526 resolved522007-09-05
AnsweredAAbutPier#206110Not recognized312007-09-05
AnsweredAAbutPier#206107Question about seismic design402007-09-05
AnsweredAAbutPier#206102Why the foundation analysis does not run352007-09-05
AnsweredAAbutPier#206100Why the seismic analysis does not run?242007-09-05
AnsweredAAbutPier#206096Reinforcement not entered when using two layers of main rebar in abutment footing heel242007-09-05
AnsweredAAbutPier#206095Why the seismic analysis does not run? · Currently viewing252007-09-05
AnsweredAAbutPier#206091Attaching the file below192007-09-04
AnsweredAAbutPier#206080About bearings392007-09-04
AnsweredAAbutPier#206068Shouldn't the larger value be applied for superstructure inertia (horizontal) force?742007-09-04
AnsweredAAbutPier#206063Inquiry about pier end beam dimensions (bearing locations)142007-09-03
AnsweredAAbutPier#206060Bridge bearing horizontal force is too large402007-09-03
AnsweredAAbutPier#206078Manual input262007-09-03
AnsweredAAbutPier#206075N-value at pile head232007-09-03
AnsweredAAbutPier#206054Error when creating sapdata for seismic analysis392007-09-03
AnsweredAAbutPier#206073New employee of 4 months482007-09-03
AnsweredAAbutPier#206059Quantity calculation report342007-09-03
Sign in to ask