AnsweredAAbutPierQ&A #2060912007-09-04 22:24 · Views 19

Attaching the file below

[전화]

Answer

안녕하세요. 한길아이티입니다. 답변이 늦어서 죄소합니다. 보내주신화일과 같이 원곡선에 사교인경우 교대의 폭원및 교량받침 설정시 사거리에 대한 산정방법에 달라지게 됩니다. 올려주신 화일의 경우 "기초자료-설계환경-교대곡선사교일경우 사거리 선형계산"에 대한 옵션을 선형에서 사거리계산으로 선택하시면 일치하게 됩니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#206112Request to check pier cap dimensions and column tie bar layout312007-09-06
AnsweredAAbutPier#206111Widening at pier center in R bridge312007-09-06
AnsweredAAbutPier#206109Superelevation calculation program error112007-09-06
AnsweredAAbutPier#206113Post 29526 resolved522007-09-05
AnsweredAAbutPier#206110Not recognized312007-09-05
AnsweredAAbutPier#206107Question about seismic design402007-09-05
AnsweredAAbutPier#206102Why the foundation analysis does not run352007-09-05
AnsweredAAbutPier#206100Why the seismic analysis does not run?242007-09-05
AnsweredAAbutPier#206096Reinforcement not entered when using two layers of main rebar in abutment footing heel242007-09-05
AnsweredAAbutPier#206095Why the seismic analysis does not run?252007-09-05
AnsweredAAbutPier#206091Attaching the file below · Currently viewing192007-09-04
AnsweredAAbutPier#206080About bearings392007-09-04
AnsweredAAbutPier#206068Shouldn't the larger value be applied for superstructure inertia (horizontal) force?742007-09-04
AnsweredAAbutPier#206063Inquiry about pier end beam dimensions (bearing locations)142007-09-03
AnsweredAAbutPier#206060Bridge bearing horizontal force is too large402007-09-03
AnsweredAAbutPier#206078Manual input262007-09-03
AnsweredAAbutPier#206075N-value at pile head232007-09-03
AnsweredAAbutPier#206054Error when creating sapdata for seismic analysis392007-09-03
AnsweredAAbutPier#206073New employee of 4 months482007-09-03
AnsweredAAbutPier#206059Quantity calculation report342007-09-03
Sign in to ask