About bearings
상부형식이 강교입니다. aroad실행후 brx 파일로 apier로 열어서 작업중인데 일반입력-지간구성입력을 보시면 교각은 좌표와 슈위치가 맞는데 교대는 불일치 하는 이유를 알고 싶네요 바쁘시지만 부탁드립니다..brx 파일 첨부해드릴께요
Answer
안녕하세요. 한길아이티입니다. 어느부분이 맞지 않는지 올려주신 내용에서 파악하기가 어렵읍니다. 좀더 구체적으로 서술해주시기 바랍니다. 그리고 상부과 상이하다면 상부화일도 같이 있어야지 검토가 가능합니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #206112 | Request to check pier cap dimensions and column tie bar layout | 31 | 2007-09-06 |
| Answered | AAbutPier | #206111 | Widening at pier center in R bridge | 31 | 2007-09-06 |
| Answered | AAbutPier | #206109 | Superelevation calculation program error | 11 | 2007-09-06 |
| Answered | AAbutPier | #206113 | Post 29526 resolved | 52 | 2007-09-05 |
| Answered | AAbutPier | #206110 | Not recognized | 31 | 2007-09-05 |
| Answered | AAbutPier | #206107 | Question about seismic design | 40 | 2007-09-05 |
| Answered | AAbutPier | #206102 | Why the foundation analysis does not run | 35 | 2007-09-05 |
| Answered | AAbutPier | #206100 | Why the seismic analysis does not run? | 24 | 2007-09-05 |
| Answered | AAbutPier | #206096 | Reinforcement not entered when using two layers of main rebar in abutment footing heel | 24 | 2007-09-05 |
| Answered | AAbutPier | #206095 | Why the seismic analysis does not run? | 25 | 2007-09-05 |
| Answered | AAbutPier | #206091 | Attaching the file below | 19 | 2007-09-04 |
| Answered | AAbutPier | #206080 | About bearings · Currently viewing | 39 | 2007-09-04 |
| Answered | AAbutPier | #206068 | Shouldn't the larger value be applied for superstructure inertia (horizontal) force? | 74 | 2007-09-04 |
| Answered | AAbutPier | #206063 | Inquiry about pier end beam dimensions (bearing locations) | 14 | 2007-09-03 |
| Answered | AAbutPier | #206060 | Bridge bearing horizontal force is too large | 40 | 2007-09-03 |
| Answered | AAbutPier | #206078 | Manual input | 26 | 2007-09-03 |
| Answered | AAbutPier | #206075 | N-value at pile head | 23 | 2007-09-03 |
| Answered | AAbutPier | #206054 | Error when creating sapdata for seismic analysis | 39 | 2007-09-03 |
| Answered | AAbutPier | #206073 | New employee of 4 months | 48 | 2007-09-03 |
| Answered | AAbutPier | #206059 | Quantity calculation report | 34 | 2007-09-03 |